A production rescheduling expert simulation system

被引:63
作者
Li, H
Li, ZC [1 ]
Li, LX
Hu, B
机构
[1] Huazhong Univ Sci & Technol, Coll Management, Wuhan 430070, Peoples R China
[2] So Illinois Univ, Dept Management, Carbondale, IL 62901 USA
关键词
production; disturbance; rescheduling; simulation; expert system;
D O I
10.1016/S0377-2217(99)00381-1
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The job shop rescheduling problem is considered as a particularly hard combinatorial optimization problem. This problem deals with uncertainty caused by the exterior business environment and interior production conditions. Production rescheduling is a common practice in Chinese manufacturing firms. Four sources of production disturbances have been identified: (1) incorrect work; (2) machine breakdowns; (3) rework due to quality problem; and (4) rush orders. These disturbances are fuzzy and random. In order to solve this ill-structured production problem, a production rescheduling expert simulation system is proposed in this paper. The production rescheduling expert simulation system integrates many techniques and methods, including simulation technique, artificial neural network, expert knowledge and dispatching rules. (C) 2000 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:283 / 293
页数:11
相关论文
共 36 条
[1]   Scheduling under a common due-date on parallel unrelated machines [J].
Adamopoulos, GI ;
Pappis, CP .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 105 (03) :494-501
[2]  
ANTONOVICH M, 1998, VISUAL FOXPRO 5 EXPL
[3]   SEQUENCING RULES AND DUE-DATE ASSIGNMENTS IN A JOB SHOP [J].
BAKER, KR .
MANAGEMENT SCIENCE, 1984, 30 (09) :1093-1104
[4]   Combining knowledge-based systems and simulation to solve rescheduling problems [J].
Belz, R ;
Mertens, P .
DECISION SUPPORT SYSTEMS, 1996, 17 (02) :141-157
[5]   ON THE MINIMIZATION OF THE WEIGHTED NUMBER OF TARDY JOBS WITH RANDOM PROCESSING TIMES AND DEADLINE [J].
DE, P ;
GHOSH, JB ;
WELLS, CE .
COMPUTERS & OPERATIONS RESEARCH, 1991, 18 (05) :457-463
[6]   A MICROCOMPUTER-BASED SCHEDULING ASSIST SYSTEM [J].
DRISCOLL, WC .
COMPUTERS & INDUSTRIAL ENGINEERING, 1993, 25 (1-4) :223-226
[7]   REACTING TO SCHEDULING EXCEPTIONS IN FMS ENVIRONMENTS [J].
DUTTA, A .
IIE TRANSACTIONS, 1990, 22 (04) :300-314
[8]   SIMULATED ANNEALING - A TOOL FOR OPERATIONAL-RESEARCH [J].
EGLESE, RW .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 46 (03) :271-281
[9]  
FOO YPS, 1988, 1988 P IEEE ICNN SAN, V2, P275
[10]   A BLOCK APPROACH FOR SINGLE-MACHINE SCHEDULING WITH RELEASE DATES AND DUE DATES [J].
GRABOWSKI, J ;
NOWICKI, E ;
ZDRZALKA, S .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1986, 26 (02) :278-285