An algorithm for thermal unit maintenance scheduling through combined use of GA SA and TS

被引:82
作者
Kim, H
Hayashi, Y
Nara, K
机构
[1] Department of Systems Engineering, Ibaraki University, Hitachi 316, 12-1
关键词
D O I
10.1109/59.574955
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper describes a method of solving a large scale long term thermal unit maintenance scheduling problem. In the solution algorithm, the genetic algorithm(GA), the simulated annealing(SA) and the tabu search(TS) are cooperatively used. The solution algorithm keeps the advantages of individual algorithm and shows a reasonable combination of local search and global search. The method takes the maintenance class and several consecutive years scheduling into consideration. Several real scale numerical examples demonstrate the effectiveness of the proposed method.
引用
收藏
页码:329 / 335
页数:7
相关论文
共 12 条
[1]  
DOPAZO TF, 1975, IEEE T PAS, V94
[2]  
EGAN GT, 1976, IEEE T SMC, V6
[3]  
GLOVER F, 1986, COMPUT OPS RES, V13
[4]  
Goldberg DE, 1989, GENETIC ALGORITHMS S
[5]  
KIM H, 1995, T IEE JAPAN B, V115
[6]  
Kirkpatrick S., 1983, SCIENCE, V220
[7]  
MUKERJI R, 1991, IEEE T PWRS, V6
[8]  
NARA K, 1991, P 3 S EXP SYST POW S
[9]  
SASAKI H, 1993, P ANNPS 93 YOK JAP
[10]  
SATOH T, 1991, IEEE T PWRS, V6