Applying a genetic algorithm-based multiobjective approach for time-cost optimization

被引:169
作者
Zheng, DXM [1 ]
Ng, ST [1 ]
Kumaraswamy, MM [1 ]
机构
[1] Univ Hong Kong, Dept Civil Engn, Hong Kong, Hong Kong, Peoples R China
关键词
optimization; cost control; time factors; algorithms; project management;
D O I
10.1061/(ASCE)0733-9364(2004)130:2(168)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Reducing both project cost and time (duration) is critical in a competitive environment. However, a trade-off between project time and cost is required. This in turn requires contracting organizations to carefully evaluate various approaches to attaining an optimal time-cost equilibrium. Although several analytical models have been developed for time-cost optimization (TCO), they mainly focus on projects where the contract duration is fixed. The optimization objective in those cases is therefore restricted to identifying the minimum total cost only. With the increasing popularity of alternative project delivery systems, clients and contractors are targeting the increased benefits and opportunities of seeking an earlier project completion. The multiobjective model for TCO proposed in this paper is powered by techniques using genetic algorithms (GAs). The proposed model integrates the adaptive weights derived from previous generations, and induces a search pressure toward an ideal point. The concept of the GA-based multiobjective TCO model is illustrated through a simple manual simulation, and the results indicate that the model could assist decision-makers in concurrently arriving at an optimal project duration and total cost.
引用
收藏
页码:168 / 176
页数:9
相关论文
共 28 条
[1]  
ADRIAN JJ, 1979, CONSTRUCTION ACCOUNT
[2]  
Alkass S., 1996, CONSTR MANAG ECON, V14, P375, DOI DOI 10.1080/014461996373250
[3]  
[Anonymous], [No title captured]
[4]  
BURNS SA, 1996, CONSTR MANAGE EC, V14, P365
[5]   An updated survey of GA-based multiobjective optimization techniques [J].
Coello, CAC .
ACM COMPUTING SURVEYS, 2000, 32 (02) :109-143
[6]   Using genetic algorithms to solve construction time-cost trade-off problems [J].
Feng, CW ;
Liu, LA ;
Burns, SA .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 1997, 11 (03) :184-189
[7]  
FONDAHL JW, 1961, 9 STANF U DEP CIV EN
[8]  
Gen M., 2000, Genetic Algorithms and Engineering Optimization
[9]   Optimization of construction time-cost trade-off analysis using genetic algorithms [J].
Hegazy, T .
CANADIAN JOURNAL OF CIVIL ENGINEERING, 1999, 26 (06) :685-697
[10]  
HENDERICKSON C, 1989, PROJECT MANAGEMENT C