Lot splitting to minimize average flow-time in two-machine flow-shop

被引:18
作者
Bukchin, J [1 ]
Tzur, M
Jaffe, M
机构
[1] Tel Aviv Univ, Dept Ind Engn, IL-69978 Tel Aviv, Israel
[2] EL AL Israel Airlines Ltd, IL-70100 Ben Gurion, Israel
关键词
D O I
10.1023/A:1016130629956
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Lot splitting is technique for accelerating the flow of work by splitting job lots into sublots. In this paper we investigate the lot splitting scheduling problem in two-machine flow-shop environment with detached setups and with batch availability. The performance measure considered is the average flow-time which is indicative of the increasingly important manufacturing lead-time. Our contribution is both theoretic and practical for the case of general ( not necessarily equal) sublots. We identify properties of the optimal solution and develop solution procedure to solve the problem. We then present computational study which indicates that our solution technique is very efficient.
引用
收藏
页码:953 / 970
页数:18
相关论文
共 22 条
[1]   A COMPARATIVE-STUDY OF LOT STREAMING PROCEDURES [J].
BAKER, KR ;
JIA, D .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1993, 21 (05) :561-566
[2]  
Baker KR., 1974, Introduction to Sequencing and Scheduling
[3]  
CHEN J, 1996, EUR J OPER RES, V26, P591
[4]  
Chen JA, 1998, IIE TRANS, V30, P1075, DOI 10.1023/A:1007563814941
[5]  
Cheng TCE, 1996, IIE TRANS, V28, P953
[6]  
Cheng TCE, 2000, NAV RES LOG, V47, P128, DOI 10.1002/(SICI)1520-6750(200003)47:2<128::AID-NAV4>3.0.CO
[7]  
2-#
[8]  
Conway R.W., 1967, Theory of Scheduling
[9]   BATCHING TO MINIMIZE FLOW TIMES ON ONE MACHINE [J].
DOBSON, G ;
KARMARKAR, US ;
RUMMEL, JL .
MANAGEMENT SCIENCE, 1987, 33 (06) :784-799
[10]   BATCHING TO MINIMIZE FLOW TIMES ON PARALLEL HETEROGENEOUS MACHINES [J].
DOBSON, G ;
KARMARKAR, US ;
RUMMEL, JL .
MANAGEMENT SCIENCE, 1989, 35 (05) :607-613