A coordination mechanism for a supply chain with demand information updating

被引:136
作者
Chen, Haoya
Chen, Jian [1 ]
Chen, Youhua Frank
机构
[1] Tsinghua Univ, Res Ctr Contemporary Management, Sch Econ & Management, Beijing 100084, Peoples R China
[2] Chinese Univ Hong Kong, Shatin, Hong Kong, Peoples R China
基金
中国国家自然科学基金;
关键词
coordination; information updating; return policy; newsvendor problem;
D O I
10.1016/j.ijpe.2005.09.002
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We consider the coordination of a supply chain with a long leadtime and demand information updating. In such a supply chain the initial production or key material procurement decision has to be made when there is limited information about the market demand. When it is the time for the final production and/or shipment decision, more accurate demand information is available, which allows the modification of the initial decision so that some costs can be saved. We consider a two-stage supply chain in which the manufacturer decides the initial production quantity in the first stage, and the retailer specifies her order quantity in the second stage after the demand forecast is improved. In this setting, the conventional return mechanism needs to be modified to coordinate the supply chain. We propose a risk sharing contract that requests the retailer to partially compensate for the manufacturer's loss that is attributable to the overproduction in the first stage, and the manufacturer to provide a partial credit for the retailer's loss that results from overstocking in the second stage. Such a contract not only extracts the maximal supply-chain profit, but can also improve the profit of each supply-chain member by tuning the contract parameters. (c) 2006 Elsevier B.V. All rights reserved.
引用
收藏
页码:347 / 361
页数:15
相关论文
共 19 条
  • [1] [Anonymous], 1980, STAT DECISION THEORY
  • [2] Barnes-Schuster D., 2002, Manufacturing & Service Operations Management, V4, P171, DOI 10.1287/msom.4.3.171.7754
  • [3] Brown A., 1997, OPTIMAL PAY TO DELAY
  • [4] Cachon G., 2000, SUPPLY CHAIN COORDIN
  • [5] Cachon G. P., 2002, HDB OPERATIONS RES M
  • [6] Cattani K., 2000, Manufacturing & Service Operations Management, V2, P119, DOI 10.1287/msom.2.2.119.12354
  • [7] Optimal two-stage ordering policy with Bayesian information updating
    Choi, TM
    Li, D
    Yan, H
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2003, 54 (08) : 846 - 859
  • [8] Efficient supply contracts for fashion goods with forecast updating and two production modes
    Donohue, KL
    [J]. MANAGEMENT SCIENCE, 2000, 46 (11) : 1397 - 1411
  • [9] Backup agreements in fashion buying - The value of upstream flexibility
    Eppen, GD
    Iyer, AV
    [J]. MANAGEMENT SCIENCE, 1997, 43 (11) : 1469 - 1484
  • [10] Reducing the cost of demand uncertainty through accurate response to early sales
    Fisher, M
    Raman, A
    [J]. OPERATIONS RESEARCH, 1996, 44 (01) : 87 - 99