The Gumbel mixed model for flood frequency analysis

被引:267
作者
Yue, S
Ouarda, TBMJ
Bobée, B
Legendre, P
Bruneau, P
机构
[1] INRS Eau, Stat Hydrol Chair, Ste Foy, PQ G1V 4C7, Canada
[2] Hydro Quebec, Hydraul Div, Montreal, PQ H3C 3G3, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
flood peak; flood volume; flood duration; Gumbel distribution; bivariate extreme distribution; joint probability distribution;
D O I
10.1016/S0022-1694(99)00168-7
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Many hydrological engineering planning, design, and management problems require a derailed knowledge of flood event characteristics, such as flood peak, volume and duration. Flood frequency analysis often focuses on flood peak values, and hence, provides a limited assessment of flood events. This paper proposes the use of the Gumbel mixed model, the bivariate extreme value distribution model with Gumbel marginals, to analyze the joint probability distribution of correlated hood peaks and volumes, and the joint probability distribution of correlated hood volumes and durations. Based on the marginal distributions of these random variables, the joint distributions, the conditional probability functions, and the associated return periods are derived. The model is tested and validated using observed flood data from the Ashuapmushuan river basin in the province of Quebec, Canada. Results indicate that the model is suitable for representing the joint distributions of hood peaks and volumes, as well as flood volumes and durations. (C) 1999 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:88 / 100
页数:13
相关论文
共 24 条
[1]  
ASHKAR F, 1980, THESIS ECOLE POLYTEC
[2]  
BOBEE B, 1994, TRENDS HYDROLOGY, V1, P117
[3]  
Castillo Enrique., 1988, EXTREME VALUE THEORY
[4]  
Correia F. N., 1987, HYDROLOGIC FREQUENCY, P541, DOI DOI 10.1007/978-94-009-3953-0_38
[5]   UNBIASED PLOTTING POSITIONS - REVIEW [J].
CUNNANE, C .
JOURNAL OF HYDROLOGY, 1978, 37 (3-4) :205-222
[6]  
Cunnane C., 1987, Hydrol. Freq. Model, P49, DOI [DOI 10.1007/978-94-009-3953-0_4, 10.1007/978-94-009-3953-0_4]
[7]  
DURRANS SR, 1998, TECHNICAL DOCUMENTS, V20, P299
[8]  
FORTIN V, 1998, R532 INRS EAU, P103
[9]   Multivariate modeling of flood flows [J].
Goel, NK ;
Seth, SM ;
Chandra, S .
JOURNAL OF HYDRAULIC ENGINEERING, 1998, 124 (02) :146-155
[10]   A PLOTTING RULE FOR EXTREME PROBABILITY PAPER [J].
GRINGORTEN, II .
JOURNAL OF GEOPHYSICAL RESEARCH, 1963, 68 (03) :813-+