Short-term capacity adjustment with offline production for a flexible manufacturing system under abnormal disturbances

被引:3
作者
De Matta, R [1 ]
Hsu, VN
Feng, CXJ
机构
[1] Univ Iowa, Coll Business Adm, Dept Management Sci, Iowa City, IA 52242 USA
[2] Hong Kong Univ Sci & Technol, Dept Ind Engn & Engn Management, Hong Kong, Hong Kong, Peoples R China
[3] Bradley Univ, Dept Ind & Mfg Engn, Peoria, IL 61625 USA
关键词
capacity planning; FMS loading; Lagrangian relaxation;
D O I
10.1023/A:1014942830746
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 [运筹学与控制论]; 12 [管理学]; 1201 [管理科学与工程]; 1202 [工商管理学]; 120202 [企业管理];
摘要
Large production variations caused by abnormal disturbances can significantly reduce the production capacity of a flexible manufacturing system (FMS). To prevent production delays, short-term capacity adjustment strategies can be used to augment the capacity of the FMS, such as working overtime, using alternative tools that are suited for faster processing, and producing parts outside of the FMS. We propose a mixed integer programming (MIP) model to obtain an optimal production plan for a multi-machine FMS. Our model evaluates both the FMS loading decision and the effective use of short-term capacity adjustment strategies to minimize the total part production cost. We develop an iterative procedure to solve the model that uses the Lagrangian relaxation method for finding lower bounds and a Lagrangian heuristic for obtaining feasible solutions. The procedure exploits certain special structures found in the Lagrangian multipliers which enable us to obtain good solutions to reasonably large test problems quickly.
引用
收藏
页码:83 / 100
页数:18
相关论文
共 22 条
[1]
AMMONS JC, 1985, ANN OPER RES, V3, P319
[2]
[Anonymous], 1979, Computers and Intractablity: A Guide to the Theoryof NP-Completeness
[3]
A BRANCH AND BOUND APPROACH FOR MACHINE LOAD BALANCING IN FLEXIBLE MANUFACTURING SYSTEMS [J].
BERRADA, M ;
STECKE, KE .
MANAGEMENT SCIENCE, 1986, 32 (10) :1316-1335
[4]
CHAKRAVARTY AK, 1984, P 1 ORSA TIMS SPEC I, P284
[5]
RATIONALIZING TOOL SELECTION IN A FLEXIBLE MANUFACTURING SYSTEM FOR SHEET-METAL PRODUCTS [J].
DASKIN, M ;
JONES, PC ;
LOWE, TJ .
OPERATIONS RESEARCH, 1990, 38 (06) :1104-1115
[6]
DUAL-BASED PROCEDURE FOR UNCAPACITATED FACILITY LOCATION [J].
ERLENKOTTER, D .
OPERATIONS RESEARCH, 1978, 26 (06) :992-1009
[7]
ALGORITHMUS 47 - AN ALGORITHM FOR THE SOLUTION OF THE 0-1 KNAPSACK-PROBLEM [J].
FAYARD, D ;
PLATEAU, G .
COMPUTING, 1982, 28 (03) :269-287
[8]
Geoffrion A, 1974, MATHEMATICAL PROGRAM, V2, P82, DOI DOI 10.1007/BFB0120690
[9]
Graves S. C., 1988, Journal of Manufacturing and Operations Management, V1, P67
[10]
Held M., 1974, Mathematical Programming, V6, P62, DOI 10.1007/BF01580223