Integration of process planning and scheduling-A modified genetic algorithm-based approach

被引:146
作者
Shao, Xinyu [1 ]
Li, Xinyu [1 ]
Gao, Liang [1 ]
Zhang, Chaoyong [1 ]
机构
[1] Huazhong Univ Sci & Technol, State Key Lab Digital Mfg Equipment & Technol, Wuhan 430074, Peoples R China
关键词
Process planning; Scheduling; Integration of process planning and scheduling; Genetic algorithm; EVOLUTIONARY ALGORITHM; PROCESS PLANS; OPTIMIZATION;
D O I
10.1016/j.cor.2008.07.006
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Traditionally, process planning and scheduling for parts were carried out in a sequential way, where scheduling was done after process plans had been generated. Considering the fact that the two functions are usually complementary, it is necessary to integrate them more tightly so that performance of a manufacturing system can be improved greatly. In this paper, a new integration model and a modified genetic algorithm-based approach have been developed to facilitate the integration and optimization of the two functions. In the model, process planning and scheduling functions are carried out simultaneously. In order to improve the optimized performance of the modified genetic algorithm-based approach, more efficient genetic representations and operator schemes have been developed. Experimental studies have been conducted and the comparisons have been made between this approach and others to indicate the superiority and adaptability of this method. The experimental results show that the proposed approach is a promising and very effective method for the integration of process planning and scheduling. (C) 2008 Elsevier Ltd. All rights reserved.
引用
收藏
页码:2082 / 2096
页数:15
相关论文
共 38 条
[1]  
[Anonymous], P 10 IEEE INT POW EL
[2]  
[Anonymous], P CSCWD2005
[3]  
BECKENDORFF U, 1991, P C FACT AUT INF MAN, P875
[4]   ALPS - A LANGUAGE FOR PROCESS SPECIFICATION [J].
CATRON, BA ;
RAY, SR .
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1991, 4 (02) :105-113
[5]  
CHRYSSOLOURIS G, 1985, ANN CIRP, V34, P413
[6]  
Chryssolouris G., 1984, Robotics and Computer- Integrated Manufacturing, V1, P315, DOI DOI 10.1016/0736-5845(84)90020-6
[7]   Mathematical modeling and heuristic approaches to flexible job shop scheduling problems [J].
Fattahi, Parviz ;
Mehrabad, Mohammad Saidi ;
Jolai, Fariborz .
JOURNAL OF INTELLIGENT MANUFACTURING, 2007, 18 (03) :331-342
[8]   An integrated scheme for process planning and scheduling in FMS [J].
Jain, Ajai ;
Jain, P. K. ;
Singh, I. P. .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 30 (11-12) :1111-1118
[9]  
KHOSHNEVIS B, 1989, 1989 IIE INTEGRATED SYSTEMS CONFERENCE & SOCIETY FOR INTEGRATED MANUFACTURING CONFERENCE, PROCEEDINGS, P415
[10]   A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling [J].
Kim, YK ;
Park, K ;
Ko, J .
COMPUTERS & OPERATIONS RESEARCH, 2003, 30 (08) :1151-1171