On-line control model for cost-simulation network projects

被引:11
作者
GolenkoGinzburg, D [1 ]
Gonik, A [1 ]
机构
[1] LUDAN ENGN CO LTD,TEL AVIV,ISRAEL
关键词
activity network; budget reassignment; chance constraint; on-line control; stochastic project;
D O I
10.2307/2584347
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper presents a newly developed hierarchical control model for several PERT type projects being realized simultaneously. The model has two objectives: to minimize the number of control points for an on-line control at the project level, and to maximize the probability that the slowest project can meet its due date on time (company level). On-line control is carried out separately for each project in order to minimize the number of control points subject to a chance constraint, which seeks to prevent deviation from the planned trajectory. If at the control point it is anticipated that the project will not be on target subject to the chance constraint, then an emergency is called. Under emergency conditions the company level is faced with the stochastic problem of budget reassigning among the projects enabling the faster projects to help the slower ones. A numerical example is presented.
引用
收藏
页码:266 / 283
页数:18
相关论文
共 29 条
[1]  
[Anonymous], 1970, PROJECT MANAGEMENT C
[2]   MANAGING PROJECT ACTIVITY DURATION UNCERTAINTIES [J].
ARSHAM, H .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1993, 21 (01) :111-122
[3]  
BERNY J, 1989, J OPER RES SOC, V40, P1121
[4]  
BRITNEY BR, 1976, MANAGE SCI, V22, P938
[5]  
Chase R.B., 1989, Production and Operations Management: A Life Cycle Approach, V5th
[6]   THE LASTING QUALITIES OF PERT - PREFERENCES AND PERCEPTIONS OF R-AND-D PROJECT MANAGERS [J].
DOUGHERTY, DM ;
STEPHENS, DB ;
EZELL, DE .
R & D MANAGEMENT, 1984, 14 (01) :47-56
[7]  
Elmaghraby S.E., 1977, Activity Networks: Project Planning and Control by Network Models
[8]  
FEILER AM, 1972, PRACTICAL APPLICATIO, P439
[9]   CONTROLLED ALTERNATIVE ACTIVITY NETWORKS FOR PROJECT-MANAGEMENT [J].
GOLENKOGINZBURG, D .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1988, 37 (03) :336-346
[10]   A 2-LEVEL DECISION-MAKING MODEL FOR CONTROLLING STOCHASTIC PROJECTS [J].
GOLENKOGINZBURG, D .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1993, 32 (01) :117-127