共 18 条
[1]
BONHOMME A, 2001, P 16 INT C EL DISTR, V482
[2]
BURGESS RP, 1990, CIGRE 26 AUG 1 SEPT
[5]
*ELTRA, 1999, SPEC CONN WIND FARMS
[8]
LEITE H, 2003, 17 INT C EL DISTR CI
[10]
Voltage rise - the big issue when connecting embedded generation to long 11 kV overhead lines
[J].
POWER ENGINEERING JOURNAL,
2002, 16 (01)
:5-12