Aggregate load-oriented workload control: A review and a re-classification of a key approach

被引:55
作者
Stevenson, Mark [1 ]
Hendry, Linda C. [1 ]
机构
[1] Univ Lancaster, Sch Management, Dept Management Sci, Lancaster LA1 4YX, England
基金
英国工程与自然科学研究理事会;
关键词
production planning and control (PPC); make to order (MTO); job shop; workload control (WLC);
D O I
10.1016/j.ijpe.2005.05.022
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The paper documents the development of an Aggregate load-oriented workload control (WLC) concept for the make to order (MTO) industry, referred to here as the Lancaster University Management School (LUMS) Approach. The paper describes how the LUMS approach has recently been re-evaluated in the light of theoretical developments and contextual requirements. Key literature developments are first reviewed, with particular reference to workload bounding and the measure of indirect load. As a result, the LUMS approach is reclassified using the eight criteria presented by [Bergamaschi et al., 1997. Order review and release strategies in a job shop environment: a review and a classification. International Journal of Production Research 35(2), 399-420] of order release mechanism, timing convention, workload measure, aggregation of workload measure, workload accounting over time, workload control, capacity planning and schedule visibility. This review of the LUMS approach has taken place in anticipation of a future empirical research project assessing the ability of the concept to improve performance in a small to medium-sized MTO enterprise. The paper includes details of the case study company, as contextual factors are known to have a varying impact on the performance of WLC concepts in practice. Future development of WLC concepts may be determined by the individual characteristics of a case study, highlighting the difficulties in providing a generic decision support system (DSS). The paper also very briefly highlights the need for web or e-based workload control systems. (c) 2005 Elsevier B.V. All rights reserved.
引用
收藏
页码:676 / 693
页数:18
相关论文
共 53 条
[1]   DUE DATE ASSIGNMENT, JOB ORDER RELEASE, AND SEQUENCING INTERACTION IN JOB SHOP SCHEDULING [J].
AHMED, I ;
FISHER, WW .
DECISION SCIENCES, 1992, 23 (03) :633-647
[2]  
Amaro G., 1999, International Journal of Operations and Production Management, V19, P349, DOI DOI 10.1108/01443579910254213
[3]  
[Anonymous], PRODUCTION INVENTORY
[4]   LOAD-ORIENTED MANUFACTURING CONTROL JUST-IN-TIME PRODUCTION FOR JOB SHOPS [J].
BECHTE, W .
PRODUCTION PLANNING & CONTROL, 1994, 5 (03) :292-307
[5]   THEORY AND PRACTICE OF LOAD-ORIENTED MANUFACTURING CONTROL [J].
BECHTE, W .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1988, 26 (03) :375-395
[6]   Order review and release strategies in a job shop environment: A review and a classification [J].
Bergamaschi, D ;
Cigolini, R ;
Perona, M ;
Portioli, A .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (02) :399-420
[7]  
Bertrand J. W. M., 1981, PRODUCTION CONTROL I
[8]   Workload based order release and productivity: a missing link [J].
Bertrand, JWM ;
Van Ooijen, HPG .
PRODUCTION PLANNING & CONTROL, 2002, 13 (07) :665-678
[9]   IMPLEMENTING A LOADING HEURISTIC IN A DISCRETE RELEASE JOB SHOP [J].
BOBROWSKI, PM .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1989, 27 (11) :1935-1948
[10]   The workload control concept: theory and practical extensions of Load Oriented Order Release [J].
Breithaupt, JW ;
Land, M ;
Nyhuis, P .
PRODUCTION PLANNING & CONTROL, 2002, 13 (07) :625-638