Optimal campaign planning scheduling of multipurpose batch semicontinuous plants .1. Mathematical formulation

被引:81
作者
Papageorgiou, LG [1 ]
Pantelides, CC [1 ]
机构
[1] UNIV LONDON IMPERIAL COLL SCI TECHNOL & MED, CTR PROC SYST ENGN, LONDON SW7 2BY, ENGLAND
关键词
D O I
10.1021/ie950081l
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
A general mathematical formulation for multiple campaign planning/scheduling of multipurpose batch/semicontinuous plants is presented. In contrast to sequential approaches, a single-level formulation is developed encompassing both overall planning considerations pertaining to the campaign structure and scheduling constraints describing the detailed operation of the plant during each campaign. The problem involves the simultaneous determination of the campaigns (i.e., duration and constituent products), and for every campaign the unit-task allocations, the task timings, and the now of material through the plant. A cyclic operating schedule is repeated at a fixed frequency within each campaign, thus simplifying significantly the management and control of the plant operation. The problem is formulated as a single-level mixed integer Linear programming model. Issues pertaining to its solution are considered in the companion paper.
引用
收藏
页码:488 / 509
页数:22
相关论文
共 29 条
[1]  
[Anonymous], 1985, CHEM ENG-LONDON, P24
[2]  
BARBOSAPOVOA AP, 1994, THESIS U LONDON
[3]   SIMULTANEOUS PRODUCTION PLANNING AND SCHEDULING IN MULTIPRODUCT BATCH PLANTS [J].
BIREWAR, DB ;
GROSSMANN, IE .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1990, 29 (04) :570-580
[4]   INCORPORATING SCHEDULING IN THE OPTIMAL-DESIGN OF MULTIPRODUCT BATCH PLANTS [J].
BIREWAR, DB ;
GROSSMANN, IE .
COMPUTERS & CHEMICAL ENGINEERING, 1989, 13 (1-2) :141-161
[5]   EFFICIENT OPTIMIZATION ALGORITHMS FOR ZERO-WAIT SCHEDULING OF MULTIPRODUCT BATCH PLANTS [J].
BIREWAR, DB ;
GROSSMANN, IE .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1989, 28 (09) :1333-1345
[6]  
CROOKS C, 1992, THESIS U LONDON
[7]   IMPROVED LINEAR INTEGER PROGRAMMING FORMULATIONS OF NONLINEAR INTEGER PROBLEMS [J].
GLOVER, F .
MANAGEMENT SCIENCE, 1975, 22 (04) :455-460
[8]  
HASEBE S, 1992, NATO ADV STUDY I BAT
[9]   A GENERAL ALGORITHM FOR SHORT-TERM SCHEDULING OF BATCH-OPERATIONS .1. MILP FORMULATION [J].
KONDILI, E ;
PANTELIDES, CC ;
SARGENT, RWH .
COMPUTERS & CHEMICAL ENGINEERING, 1993, 17 (02) :211-227
[10]  
Kondili E., 1988, 3 INT S PROCESS SYST, V88, P62