Stochastic construction time-cost trade-off analysis

被引:105
作者
Feng, CW
Liu, L
Burns, SA
机构
[1] Natl Cheng Kung Univ, Dept Civil Engn, Tainan 70101, Taiwan
[2] Univ Illinois, Dept Civil Engn, Urbana, IL 61801 USA
[3] Univ Illinois, Dept Gen Engn, Urbana, IL 61801 USA
关键词
D O I
10.1061/(ASCE)0887-3801(2000)14:2(117)
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Traditional time-cost trade-off analysis assumes that the time and cost of an option within an activity are deterministic. However, in reality the time and cost are uncertain. Therefore, in analyzing the time-cost trade-off problem, uncertainties should be considered when minimizing project duration or cost. Simulation techniques are useful for analyzing stochastic effects, but a general strategy/algorithm is needed to guide the analysis to obtain optimal solutions. This paper presents a hybrid approach that combines simulation techniques and genetic algorithms to solve the time-cost trade-off problem under uncertainty. The results show that genetic algorithms can be integrated with simulation techniques to provide an efficient and practical means of obtaining optimal project schedules while assessing the associated risks in terms of time and cost of a construction project. This new approach provides construction engineers with a new way of analyzing construction time/cost decisions in a more realistic manner. Historical time/cost data and available options to complete a project can be modeled, so that construction engineers can identify the best strategies to take to complete the project at minimum time and cost. Also, what-if scenarios can be explored to decide the desired/optimal time and/or cost in planning and executing project activities.
引用
收藏
页码:117 / 126
页数:10
相关论文
共 25 条
[1]  
[Anonymous], 1989, GENETIC ALGORITHM SE
[2]  
[Anonymous], [No title captured]
[3]  
BELL CE, 1991, NAV RES LOG, V38, P315, DOI 10.1002/1520-6750(199106)38:3<315::AID-NAV3220380304>3.0.CO
[4]  
2-7
[5]   HEURISTICS FOR SCHEDULING PROJECTS WITH RESOURCE RESTRICTIONS AND SEVERAL RESOURCE-DURATION MODES [J].
BOCTOR, FF .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (11) :2547-2558
[6]  
Burns SA., 1996, CONSTR MANAGE EC, V14, P265, DOI [DOI 10.1080/014461996373511, 10.1080/014461996373511]
[7]   THE DISCRETE TIME-COST TRADEOFF PROBLEM REVISITED [J].
DE, P ;
DUNNE, EJ ;
GHOSH, JB ;
WELLS, CE .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 81 (02) :225-238
[8]   BOUNDING THE PROJECT COMPLETION-TIME DISTRIBUTION IN PERT NETWORKS [J].
DODIN, B .
OPERATIONS RESEARCH, 1985, 33 (04) :862-881
[9]   RESOURCE-ALLOCATION VIA DYNAMIC-PROGRAMMING IN ACTIVITY NETWORKS [J].
ELMAGHRABY, SE .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 64 (02) :199-215
[10]   Using genetic algorithms to solve construction time-cost trade-off problems [J].
Feng, CW ;
Liu, LA ;
Burns, SA .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 1997, 11 (03) :184-189