Improvement of the cogeneration plant economy by using heat accumulator

被引:77
作者
Bogdan, Zeljko
Kopjar, Damir
机构
[1] Univ Zagreb, Fac Mec Engn & Naval Architecture, Zagreb 10000, Croatia
[2] HEP Proizvodnja DOO, Zagreb 10000, Croatia
关键词
D O I
10.1016/j.energy.2006.01.012
中图分类号
O414.1 [热力学];
学科分类号
摘要
The optimisation code ACOM (Advanced Cogeneration Optimisation Model) is used with purpose of assessing influence of the district heat accumulator on the Elektrana-Toplana (EL-TO) Zagreb cogeneration plant economic performance. The plant supplies hot water for district heating, steam for industry and electric power. It is possible to achieve economic benefits by charging the accumulator during the day time, when the electricity price is high, and by releasing district heat during cheap night hours, when other parts of equipment may be shut down. The consequences of this strategy are the decrease of total annual electricity production and fuel consumption, whereby the savings of some 1.8 mil Euro/a are achieved with the reduction of CO2 emission by about 23,000 t/a or 6.4% and SOx by about 200 t/a or 16.9%. (c) 2006 Elsevier Ltd. All rights reserved.
引用
收藏
页码:2285 / 2292
页数:8
相关论文
共 7 条
[1]  
BOGDAN Z, 2001, P 23 INT C INF TECHN, P343
[2]  
Boyce M.P., 2010, Handbook for Cogeneration and Combined Cycle Power Plants
[3]   On the cost optimization of a district heating facility using a steam-injected gas turbine cycle [J].
Krause, A ;
Tsatsaronis, G ;
Sauthoff, M .
ENERGY CONVERSION AND MANAGEMENT, 1999, 40 (15-16) :1617-1626
[4]  
Lasdon L. S., 1978, ACM Transactions on Mathematical Software, V4, P34, DOI 10.1145/355769.355773
[5]  
*SWED DISTR HEAT A, 1979, DISTR HEAT SWED
[6]  
WENZ A, 2000, COMPUTER AIDED APPL
[7]   Modeling of (cogeneration) power plants on time-dependent power demands of the consumer [J].
Witzani, M ;
Pechtl, P .
JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME, 1996, 118 (02) :353-358