Sudden failure of biological nitrogen and carbon removal in the full-scale pre-denitrification process treating cokes wastewater

被引:66
作者
Kim, Young Mo [1 ]
Park, Donghee [1 ]
Lee, Dae Sung [2 ]
Jung, Kyung A. [1 ]
Park, Jong Moon [1 ]
机构
[1] Pohang Univ Sci & Technol, Sch Environm Sci & Engn, Dept Chem Engn, Adv Environm Biotechnol Res Ctr, Pohang 790784, South Korea
[2] Kyungpook Natl Univ, Dept Environm Engn, Taegu 702701, South Korea
关键词
Cokes wastewater; Pre-denitrification process; Phenol; Thiocyanate; Ammonia; ACTIVATED-SLUDGE TREATMENT; AEROBIC BIODEGRADATION; TREATMENT FACILITY; BIOFILM REACTOR; TREATMENT-PLANT; NITRIFICATION; THIOCYANATE; CYANIDE; PHENOL; POLLUTANTS;
D O I
10.1016/j.biortech.2009.04.014
中图分类号
S2 [农业工程];
学科分类号
0828 ;
摘要
A full-scale pre-denitrification process treating cokes wastewater containing toxic compounds such as phenols, cyanides and thiocyanate has shown good performance in carbon and nitrogen removal. However, field operators have been having trouble with its instability without being able to identify the causes. To clarify the main cause of these sudden failures of the process, comprehensive studies were conducted on the pre-denitrification process using a lab-scale reactor system with real cokes wastewater. First, the shock loading effects of three major pollutants were investigated individually. As the loading amount of phenol increased to 600 mg/L, more COD, TOC and phenol itself were flowed into the aerobic reactor, but phenol itself did not inhibit nitrification and denitrification, owing to the effect of dilution and its rapid biodegradation. Higher loading of ammonia or thiocyanate slightly enhanced the removal efficiency of organic matter, but caused the final discharge concentration of total nitrogen to be above its legal limit of 60 mg-N/L. Meanwhile, continuous inflow of abnormal wastewater collected during unstable operation of the full-scale pre-denitrification process, caused a sudden failure of nitrogen removal in the lab-scale process, like the removal pattern of the full-scale one. This was discovered to be due to the lack of inorganic carbon in the aerobic reactor where autotrophic nitrification occurs. (C) 2009 Elsevier Ltd. All rights reserved.
引用
收藏
页码:4340 / 4347
页数:8
相关论文
共 28 条
[1]  
APHA/AWWA/WEF, 2017, Standard Methods for the Examination of Water and Wastewater, V23rd
[2]   Effect of internal recycle on the nitrogen removal efficiency of an anaerobic/anoxic/oxic (A2/O) wastewater treatment plant (WWTP) [J].
Baeza, JA ;
Gabriel, D ;
Lafuente, J .
PROCESS BIOCHEMISTRY, 2004, 39 (11) :1615-1624
[3]   Effect of HRT and recycle ratio on removal of cyanide, phenol, thiocyanate and ammonia in an anaerobic-anoxic-aerobic continuous system [J].
Chakraborty, S ;
Veeramani, H .
PROCESS BIOCHEMISTRY, 2006, 41 (01) :96-105
[4]   EFFECTS OF THE ACTIVITY OF HETEROTROPHS ON NITRIFICATION IN A SUSPENDED-GROWTH REACTOR [J].
HANAKI, K ;
WANTAWIN, C ;
OHGAKI, S .
WATER RESEARCH, 1990, 24 (03) :289-296
[5]   Biodegradation of thiocyanate in biofilm reactor using fluidized-carriers [J].
Jeong, YS ;
Chung, JS .
PROCESS BIOCHEMISTRY, 2006, 41 (03) :701-707
[6]   Effect of HRT on the biological pre-denitrification process for the simultaneous removal of toxic pollutants from cokes wastewater [J].
Kim, Young Mo ;
Park, Donghee ;
Jeon, Che Ok ;
Lee, Dae Sung ;
Park, Jong Moon .
BIORESOURCE TECHNOLOGY, 2008, 99 (18) :8824-8832
[7]   Inhibitory effects of toxic compounds on nitrification process for cokes wastewater treatment [J].
Kim, Young Mo ;
Park, Donghee ;
Lee, Dae Sung ;
Park, Jong Moon .
JOURNAL OF HAZARDOUS MATERIALS, 2008, 152 (03) :915-921
[8]   Instability of biological nitrogen removal in a cokes wastewater treatment facility during summer [J].
Kim, Young Mo ;
Park, Donghee ;
Lee, Dae Sung ;
Park, Jong Moon .
JOURNAL OF HAZARDOUS MATERIALS, 2007, 141 (01) :27-32
[9]  
Kumar M Suresh, 2003, Indian J Environ Health, V45, P29
[10]   Biological nitrogen removal from coke plant wastewater with external carbon addition [J].
Lee, MW ;
Park, JM .
WATER ENVIRONMENT RESEARCH, 1998, 70 (05) :1090-1095