Thermal plant bids and market clearing in an electricity pool.: Minimization of costs vs. minimization of consumer payments

被引:40
作者
Alonso, J
Trías, A
Gaitan, V
Alba, JJ
机构
[1] Grp Endesa, Madrid 28002, Spain
[2] Aplicac Informat Avanzada SA, Ctr Empreses Noves Tecnol, Cerdanyola 08290, Spain
关键词
market clearing algorithms; marginal price; simple bids; inter-temporal links; pool design;
D O I
10.1109/59.801892
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The Spanish wholesale electricity market has started on January 1(st), 1998. Though it is based on simple price/quantity bids, it incorporates some provisions to take thermal plant running requirements into account. This paper presents these rules and its mathematical treatment, focusing on a possible implementation of the "minimum income condition", which allows thermal generators to declare minimum stable loads. It also shows another key point in the debate: whether the algorithm should minimize costs or consumer payments.
引用
收藏
页码:1327 / 1332
页数:6
相关论文
共 9 条
[1]  
ALBA JJ, 1996, THESIS U PONTIFICIA
[2]  
COHEN AI, 1997, CIGRE S IMP OP TRAD
[3]  
*CSEN, 1997, PROP MOD CAS OF
[4]  
HAO S, 1997, PICA 97 TECHN SESS
[5]   Artificial power markets and unintended consequences [J].
Jacobs, JM .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1997, 12 (02) :968-972
[6]  
JOHNSON R, 1996, POW C U CAL EN I BER
[7]  
PEARL J, 1985, HEURISTICS
[8]  
*WHOL MARK DES WOR, 1997, SINT MET TRANS CAS O
[9]  
WILSON R, 1997, POW C U CAL EN I BER