GLUE Based Assessment on the Overall Predictions of a MIKE SHE Application

被引:52
作者
Vazquez, R. F. [1 ]
Beven, K. [2 ]
Feyen, J. [3 ]
机构
[1] Unidad Hidraul Tecn & Proyectos SA TYPSA, Barcelona 08037, Spain
[2] Univ Lancaster, Inst Environm & Biol Sci, Ctr Res Environm Syst & Stat, Lancaster LA1 4YQ, England
[3] Katholieke Univ Leuven, Dept Landbeheer Econ, Div Soil & Water Management, B-3001 Heverlee, Belgium
关键词
MIKE SHE; Likelihood; Uncertainty; Prediction limits; Monte Carlo simulations; GLUE; Partial duration time series; Extreme value analysis; Piezometers; POTENTIAL EVAPOTRANSPIRATION; EFFECTIVE PARAMETERS; HYDROLOGIC-MODELS; UNCERTAINTY; CALIBRATION; CATCHMENT; PERFORMANCE; VALIDATION; SIMULATION; SCALE;
D O I
10.1007/s11269-008-9329-6
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The generalised likelihood uncertainty estimation (GLUE) approach was applied to assess the performance of a distributed catchment model and to estimate prediction limits after conditioning based on observed catchment-wide streamflow. Prediction limits were derived not only for daily streamflow but also for piezometric levels and for extreme events. The latter analysis was carried out considering independent partial duration time series (PDS) obtained from the observed daily streamflow hydrograph. Important data uncertainties were identified. For streamflow the stage-discharge data analysis led to estimate an average data uncertainty of about 3 m(3) s (-aEuro parts per thousand 1). For piezometric levels, data errors were estimated to be in the order of 5 m in average and 10 m at most. The GLUE analysis showed that most of the inspected parameters are insensitive to model performance, except the horizontal and vertical components of the hydraulic conductivity of one of the geological layers that have the most influence on the streamflow model performance in the application catchment. The study revealed a considerable uncertainty attached to the simulation of both high flows and low flows (i.e., in average terms 5 m(3) s (-aEuro parts per thousand 1) before the Bayesian updating of the prediction limits). Similarly, wide prediction intervals were obtained for the piezometric levels in relevant wells, in the order of 3.3 and 1.5 m before and after the Bayesian updating of the prediction limits, respectively. Consequently, the results suggest that, in average terms, the model of the catchment predicts overall outputs within the limitations of the errors in the input variables.
引用
收藏
页码:1325 / 1349
页数:25
相关论文
共 56 条
[51]   Effect of grid size on effective parameters and model performance of the MIKE-SHE code [J].
Vázquez, RF ;
Feyen, L ;
Feyen, J ;
Refsgaard, JC .
HYDROLOGICAL PROCESSES, 2002, 16 (02) :355-372
[52]  
VAZQUEZ RF, 2003, THESIS KATHOLIEKE U
[53]  
VEREECKEN H, 1988, PEDOTRANSFERFUNCTION
[54]  
Willems P., 1998, Hydrology in a changing environment. Volume III. Proceedings of the British Hydrological Society International Conference, Exeter, UK, July 1998., P15
[55]   Calibration, Validation and Sensitivity Analysis of the MIKE-SHE Model Using the Neuenkirchen Catchment as Case Study [J].
Xevi, E. ;
Christiaens, K. ;
Espino, A. ;
Sewnandan, W. ;
Mallants, D. ;
Sorensen, H. ;
Feyen, J. .
WATER RESOURCES MANAGEMENT, 1997, 11 (03) :219-242
[56]   Comparison of uncertainty analysis methods for a distributed rainfall-runoff model [J].
Yu, PS ;
Yang, TC ;
Chen, SJ .
JOURNAL OF HYDROLOGY, 2001, 244 (1-2) :43-59