Implementation of an (ACE)over-bar1 decomposition method

被引:10
作者
Hoonchareon, NB [1 ]
Ong, CM
Kramer, RA
机构
[1] Chulalongkorn Univ, Dept Elect Engn, Bangkok, Thailand
[2] Purdue Univ, Sch Elect & Comp Engn, W Lafayette, IN 47907 USA
[3] NiSource Energy Technol, Merrillville, IN 46410 USA
关键词
area control error (ACE); ancillary services; regulation;
D O I
10.1109/TPWRS.2002.801035
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 [电气工程]; 0809 [电子科学与技术];
摘要
Having established feasibility and developed a method to decompose control area's (ACE(1)) over bar into components attributable to load changes in subareas within the control area, this paper addresses some of the practical issues with an on-line implementation of the (ACE(1)) over bar model and the decomposition method. Issues examined here include time-varying system conditions, nonlinearities in the governors' dead bands and AGC loop, and the impact of load disturbance external to the control area. An on-line recursive parameter estimation technique with adjustable forgetting factor to update the (ACE(1)) over bar model parameters is proposed.
引用
收藏
页码:757 / 761
页数:5
相关论文
共 9 条
[1]
COHN N, 1966, CONTROL GEN POWER FL
[2]
[3]
HANDERSON PD, 1990, IEEE T POWER SYST, V5, P111
[4]
HOONCHAREON N, 2002, FEASIBILITY DECOMPOS, V17
[5]
*IEEE COMM REP, 1973, IEEE T POWER APP SYS, V9, P1904
[6]
JALEELI N, 1997, TR107813 EPRI
[7]
VARIABLE, NON-LINEAR TIE-LINE FREQUENCY BIAS FOR INTERCONNECTED SYSTEMS CONTROL [J].
KENNEDY, T ;
HOYT, SM ;
ABELL, CF .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1988, 3 (03) :1244-1253
[8]
Ljung L., 1983, THEORY PRACTICE RECU
[9]
*N AM EL REL COUNC, 2000, POL 1 GEN CONTR PERF