Server staffing to meet time-varying demand

被引:155
作者
Jennings, OB
Mandelbaum, A
Massey, WA
Whitt, W
机构
[1] TECHNION ISRAEL INST TECHNOL,IL-32000 HAIFA,ISRAEL
[2] AT&T BELL LABS,MURRAY HILL,NJ 07974
[3] AT&T BELL LABS,LUCENT TECHNOL,MURRAY HILL,NJ 07974
关键词
operator staffing; queues; nonstationary queues; queues with time-dependent arrival rates; multiserver queues; infinite-server queues; capacity planning;
D O I
10.1287/mnsc.42.10.1383
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider a multiserver service system with general nonstationary arrival and service-time processes in which s(t), the number of servers as a function of time, needs to be selected to meet projected loads. We try to choose s(t) so that the probability of a delay (before beginning service) hits or falls just below a target probability at all times. We develop an approximate procedure based on a time-dependent normal distribution, where the mean and variance are determined by infinite-sewer approximations. We demonstrate that this approximation is effective by making comparisons with the exact numerical solution of the Markovian M(t)/M/S-t model.
引用
收藏
页码:1383 / 1394
页数:12
相关论文
共 39 条
[1]   ESTABLISHING TELEPHONE-AGENT STAFFING LEVELS THROUGH ECONOMIC OPTIMIZATION [J].
ANDREWS, B ;
PARSONS, H .
INTERFACES, 1993, 23 (02) :14-20
[2]   LL-BEAN, CHOOSES A TELEPHONE AGENT SCHEDULING SYSTEM [J].
ANDREWS, BH ;
PARSONS, HL .
INTERFACES, 1989, 19 (06) :1-9
[3]  
[Anonymous], 1976, DECIS SCI, DOI DOI 10.1111/J.1540-5915.1976.TB00706.X
[4]   AT-AND-TS CALL PROCESSING SIMULATOR (CAPS) OPERATIONAL DESIGN FOR INBOUND CALL CENTERS [J].
BRIGANDI, AJ ;
DARGON, DR ;
SHEEHAN, MJ ;
SPENCER, T .
INTERFACES, 1994, 24 (01) :6-28
[5]   SENSITIVITY TO THE SERVICE-TIME DISTRIBUTION IN THE NONSTATIONARY ERLANG LOSS MODEL [J].
DAVIS, JL ;
MASSEY, WA ;
WHITT, W .
MANAGEMENT SCIENCE, 1995, 41 (06) :1107-1116
[6]  
ECKBERG AE, 1983, P 10 INT TEL C MONTR
[7]   THE PHYSICS OF THE M(T)/G/IOTA QUEUE [J].
EICK, SG ;
MASSEY, WA ;
WHITT, W .
OPERATIONS RESEARCH, 1993, 41 (04) :731-742
[8]   MT/G/INFINITY QUEUES WITH SINUSOIDAL ARRIVAL RATES [J].
EICK, SG ;
MASSEY, WA ;
WHITT, W .
MANAGEMENT SCIENCE, 1993, 39 (02) :241-252
[9]  
Feller W., 1968, INTRO PROBABILITY TH
[10]   TELEPHONE SALES MANPOWER-PLANNING AT QANTAS [J].
GABALLA, A ;
PEARCE, W .
INTERFACES, 1979, 9 (03) :1-9