Improved Dynamic Programming for Hydropower Reservoir Operation

被引:152
作者
Zhao, Tongtiegang [1 ]
Zhao, Jianshi [1 ]
Yang, Dawen [1 ]
机构
[1] Tsinghua Univ, Dept Hydraul Engn, State Key Lab Hydrosci & Engn, Beijing 100084, Peoples R China
基金
中国国家自然科学基金;
关键词
Hydro power; Reservoirs; Computer programming; Concavity; Complementarity; Monotonicity; Dynamic programming; Hydropower; TERM OPERATION; MODEL; OPTIMIZATION; SYSTEMS;
D O I
10.1061/(ASCE)WR.1943-5452.0000343
中图分类号
TU [建筑科学];
学科分类号
081407 [建筑环境与能源工程];
摘要
The writers propose a successive improved dynamic programming (SIDP) algorithm for hydropower reservoir operation based on an analysis of concavity, complementarity, and monotonicity of hydropower problems. For single-period hydropower generation, storage and release have diminishing marginal contributions to hydropower generation (i.e.,concavity), and there is also a complementary effect between storage and release (i.e.,release becomes more productive in accordance with increasing storage). For multiple-period hydropower generation, the complementarity influences the concavity of the objective function and the monotonicity of operation decisions, and is the major cause of complexity in hydropower operation. With mathematical derivations, the writers propose a concave approximation to the hydropower generation function and a SIDP algorithm for hydropower reservoir operation. The efficiency of SIDP is demonstrated with two hypothetical case studies of long-term hydropower scheduling, which shows that the computation time of SIDP increases linearly in accordance with the number of storage intervals [i.e.,O(n)], whereas dynamic programming (DP) shows a quadratic increase [i.e.,O(n2)].
引用
收藏
页码:365 / 374
页数:10
相关论文
共 31 条
[1]
[Anonymous], 2005, WATER RESOURCES SYST
[2]
DUAL IN NONLINEAR PROGRAMMING AND ITS ECONOMIC INTERPRETATION [J].
BALINSKI, ML ;
BAUMOL, WJ .
REVIEW OF ECONOMIC STUDIES, 1968, 35 (03) :237-256
[3]
Daily optimized model for long-term operation of the Three Gorges-Gezhouba Cascade Power Stations [J].
Cao GuangJing ;
Cai ZhiGuo ;
Liu ZhiWu ;
Wang GuangQian .
SCIENCE IN CHINA SERIES E-TECHNOLOGICAL SCIENCES, 2007, 50 (Suppl 1) :98-110
[4]
Tree-based reinforcement learning for optimal water reservoir operation [J].
Castelletti, A. ;
Galelli, S. ;
Restelli, M. ;
Soncini-Sessa, R. .
WATER RESOURCES RESEARCH, 2010, 46
[5]
Comparison of particle swarm optimization and dynamic programming for large scale hydro unit load dispatch [J].
Cheng, Chun-tian ;
Liao, Sheng-li ;
Tang, Zi-Tian ;
Zhao, Ming-yan .
ENERGY CONVERSION AND MANAGEMENT, 2009, 50 (12) :3007-3014
[6]
Short-Term Scheduling for Large-Scale Cascaded Hydropower Systems with Multivibration Zones of High Head [J].
Cheng, Chuntian ;
Shen, Jianjian ;
Wu, Xinyu .
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2012, 138 (03) :257-267
[7]
HYDROPOWER OPTIMIZATION VIA SEQUENTIAL QUADRATIC-PROGRAMMING [J].
DIAZ, GE ;
FONTANE, DG .
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 1989, 115 (06) :715-734
[8]
Optimal hedging and carryover storage value [J].
Draper, AJ ;
Lund, JR .
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 2004, 130 (01) :83-87
[9]
Optimal Multipurpose-Multireservoir Operation Model with Variable Productivity of Hydropower Plants [J].
Goor, Q. ;
Kelman, R. ;
Tilmant, A. .
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2011, 137 (03) :258-267
[10]
ALGORITHMS FOR OPTIMIZING HYDROPOWER SYSTEM OPERATION [J].
GRYGIER, JC ;
STEDINGER, JR .
WATER RESOURCES RESEARCH, 1985, 21 (01) :1-10