The relative utility of regression and artificial neural networks models for rapidly predicting the capacity of water supply reservoirs

被引:22
作者
Adeloye, Adebayo [1 ]
机构
[1] Heriot Watt Univ, Sch Built Environm, Edinburgh EH14 4AS, Midlothian, Scotland
关键词
Artificial neural networks; Storage-yield-reliability; Sequent-peak algorithm; Over-year capacity; Within-year capacity; Multiple regression; Un-gauged sites; OVER-YEAR; RELIABILITY; ALGORITHM;
D O I
10.1016/j.envsoft.2009.04.002
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Rapid prediction tools for reservoir over-year and within-year capacities that dispense with the sequential analysis of time-series runoff data are developed using multiple linear regression and multilayer perceptron, artificial neural networks (MLP-ANNs). Linear regression was used to model the total (i.e. within-year + over-year) capacity using the over-year capacity as one of the inputs, while the ANNs were used to Simultaneously model directly the over-year and total capacities. The inputs used for the ANNs were basic runoff and systems variables Such as the coefficient of variation (Cv) of annual and monthly runoff, minimum monthly runoff, the demand ratio and reservoir reliability. The results showed that all the models performed well during their development and when they were tested with independent data sets. Both models offer faster prediction tools for reservoir Capacity at gauged sites when compared with behaviour simulation. Additionally, when the predictor variables can be evaluated at ungauged sites using e.g. catchment characteristics, they make capacity estimation at such un-gauged sites a feasible proposition. (C) 2009 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1233 / 1240
页数:8
相关论文
共 19 条
[1]   Regression models for within-year capacity adjustment in reservoir planning [J].
Adeloye, AJ ;
Lallemand, F ;
McMahon, TA .
HYDROLOGICAL SCIENCES JOURNAL-JOURNAL DES SCIENCES HYDROLOGIQUES, 2003, 48 (04) :539-552
[2]   Curing the misbehavior of reservoir capacity statistics by controlling shortfall during failures using the modified sequent peak algorithm [J].
Adeloye, AJ ;
Montaseri, M ;
Garmann, C .
WATER RESOURCES RESEARCH, 2001, 37 (01) :73-82
[3]   Predicting critical period to characterise over-year and within-year reservoir systems [J].
Adeloye, AJ ;
Montaseri, M .
WATER RESOURCES MANAGEMENT, 1999, 13 (06) :383-407
[4]   Daily reservoir inflow forecasting using artificial neural networks with stopped training approach [J].
Coulibaly, P ;
Anctil, F ;
Bobée, B .
JOURNAL OF HYDROLOGY, 2000, 230 (3-4) :244-257
[5]   Flood estimation at ungauged sites using artificial neural networks [J].
Dawson, CW ;
Abrahart, RJ ;
Shamseldin, AY ;
Wilby, RL .
JOURNAL OF HYDROLOGY, 2006, 319 (1-4) :391-409
[6]  
Demuth H., 2003, NEURAL NETWORK TOOLB
[7]   NEURAL NETWORKS IN CIVIL ENGINEERING .1. PRINCIPLES AND UNDERSTANDING [J].
FLOOD, I ;
KARTAM, N .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 1994, 8 (02) :131-148
[8]  
Gallager R. G., 1968, Information Theory and Reliable Communication, V588
[9]  
Govindaraju RS, 2000, J HYDROL ENG, V5, P115
[10]   A GLOBAL CLASSIFICATION OF RIVER REGIMES [J].
HAINES, AT ;
MCMAHON, TA ;
FINLAYSON, BL .
APPLIED GEOGRAPHY, 1988, 8 (04) :255-272