Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespan

被引:41
作者
Al-Anzi, Fawaz S. [2 ]
Allahverdi, Ali [1 ]
机构
[1] Kuwait Univ, Dept Ind & Management Syst Engn, Safat, Kuwait
[2] Kuwait Univ, Dept Comp Engn, Safat, Kuwait
关键词
Assembly flowshop; Bicriteria; Makespan; Maximum lateness; Heuristic; SCHEDULING PROBLEM; MINIMIZE MAKESPAN; BOUND ALGORITHM; 3-MACHINE; SEARCH; BRANCH; SHOPS; MODEL;
D O I
10.1016/j.cor.2008.11.018
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
We consider a two-stage assembly flowshop scheduling problem with the objective of minimizing a weighted sum of makespan and maximum lateness. The problem is known to be NP-hard, and therefore, we propose heuristics to solve the problem. The proposed heuristics are Tabu search (Tabu), particle swarm optimization (PSO), and self-adaptive differential evolution (SDE). An extensive computational experiment is conducted to compare performances of the proposed heuristics. The computational experiment reveals that both PSO and SIDE are much superior to Tabu. Moreover, it is statistically shown that PSO performs better than SDE. The computation times of both PSO and SDE are close to each other and they are less than 40 and 45 s, respectively, for the largest size problem considered. (C) 2008 Elsevier Ltd. All rights reserved.
引用
收藏
页码:2682 / 2689
页数:8
相关论文
共 29 条
[1]   A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times [J].
Al-Anzi, Fawaz S. ;
Allahverdi, Ali .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 182 (01) :80-94
[2]   A PSO and a Tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application [J].
Allahverdi, A ;
Al-Anzi, FS .
COMPUTERS & OPERATIONS RESEARCH, 2006, 33 (04) :1056-1080
[3]   A review of scheduling research involving setup considerations [J].
Allahverdi, A ;
Gupta, JND ;
Aldowaisan, T .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1999, 27 (02) :219-239
[4]   The two-stage assembly flowshop scheduling problem with bicriteria of makespan and mean completion time [J].
Allahverdi, Ali ;
Al-Anzi, Fawaz S. .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 37 (1-2) :166-177
[5]   A survey of scheduling problems with setup times or costs [J].
Allahverdi, Ali ;
Ng, C. T. ;
Cheng, T. C. E. ;
Kovalyov, Mikhail Y. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) :985-1032
[6]   Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times [J].
Allahverdi, Ali ;
Al-Anzi, Fawaz S. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (22) :4713-4735
[7]   Operating theatre scheduling using Lagrangian relaxation [J].
Augusto, V. ;
Xie, X. ;
Perdomo, V. .
EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2008, 2 (02) :172-189
[8]  
Babu BV, 2003, IEEE C EVOL COMPUTAT, P2696
[9]  
Ben Hmida A, 2007, EUR J IND ENG, V1, P223, DOI 10.1504/EJIE.2007.014110
[10]   Metaheuristics for solving economic lot scheduling problems (ELSP) using time-varying lot-sizes approach [J].
Chandrasekaran, C. ;
Rajendran, Chandrasekharan ;
Chetty, O. V. Krishnaiah ;
Hanumanna, Donakonda .
EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2007, 1 (02) :152-181