Supply chain risk identification with value-focused process engineering

被引:165
作者
Neiger, Dina [2 ]
Rotaru, Kristian [2 ]
Churilov, Leonid [1 ]
机构
[1] Univ Melbourne, Parkville, Vic 3052, Australia
[2] Monash Univ, Caulfield, Vic 3145, Australia
关键词
Value-focused process engineering; Risk identification; Supply chain management; Process-based risks; MANAGEMENT;
D O I
10.1016/j.jom.2007.11.003
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Together with numerous benefits that were brought about by the transition from the silo enterprise perspective towards the process-based supply chain view of contemporary business, new sources of risk appeared due to the complex systemic nature of the supply chains. The need to reduce the increased level of supply chain vulnerability has been identified as a key research issue in the domain of supply chain management. In this paper, a novel value-focused process engineering methodology for process-based supply chain risk identification is proposed with the aim to increase value to supply chain members and supply chain as a whole. The proposed methodology is illustrated with a generic supply chain scenario example. (C) 2007 Elsevier B.V All rights reserved.
引用
收藏
页码:154 / 168
页数:15
相关论文
共 51 条
[1]   Supply chain networks, electronic commerce, and supply side and demand side risk [J].
Anna, N ;
Cruz, J ;
Dong, J ;
Zhang, D .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 164 (01) :120-142
[2]  
*ASS INS RISK MAN, 2002, RISK MAN STAND
[3]   Proactive supply-chain event management with agent technology [J].
Bodendorf, F ;
Zimmermann, R .
INTERNATIONAL JOURNAL OF ELECTRONIC COMMERCE, 2005, 9 (04) :57-89
[4]   The allocation of inventory risk in a supply chain: Push, pull, and advance-purchase discount contracts [J].
Cachon, GP .
MANAGEMENT SCIENCE, 2004, 50 (02) :222-238
[5]  
CARR M, 1993, CMUSEI93TR006
[6]  
Chopra S, 2004, MIT SLOAN MANAGE REV, V46, P53
[7]   Development of an intelligent customer-supplier relationship management system: the application of case-based reasoning [J].
Choy, KL ;
Fan, KKH ;
Lo, V .
INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 2003, 103 (3-4) :263-274
[8]  
CHRISTOPHER M, 2004, INT J PHYS DISTRIB, V34, P338
[9]  
Christopher M., 1998, LOGISTICS SUPPLY CHA, V2nd
[10]  
Committee of Sponsoring Organizations of the Treadway Commission (COSO), 2004, ENT RISK MAN INT FRA