Analysis and optimization of a U-shaped production line

被引:30
作者
Ohno, K [1 ]
Nakade, K [1 ]
机构
[1] NAGOYA INST TECHNOL,DEPT SYST ENGN,SHOWA KU,NAGOYA,AICHI 466,JAPAN
关键词
D O I
10.15807/jorsj.40.90
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In the just-in-time context, parts are often processed by a single-unit production and conveyance system (called ''ikko-nagashi'' in Japanese) without conveyors. The U-shaped layout, in which each multifunction worker takes charge of several machines, has been introduced as an implementation of this concept. Presently the layout is gaining an increasing popularity due to the low running cost. In this paper, first we deal with the U-shaped production line with a single multi-function worker. We derive his waiting time and a cycle time of the line when processing times of items, operation times, and his walking times between machines are constants. Then we deal with a U-shaped production line with multiple workers. We derive the overall cycle time of this line, and consider an optimal worker allocation problem that minimizes the overall cycle time when the number of workers is given. In particular, it is shown that the U-shaped layout is superior to the linear layout for lines with one or two workers. We also discuss the case where those processing, operation and walking times are stochastic.
引用
收藏
页码:90 / 104
页数:15
相关论文
共 3 条
[1]   A SURVEY OF EXACT ALGORITHMS FOR THE SIMPLE ASSEMBLY LINE BALANCING PROBLEM [J].
BAYBARS, I .
MANAGEMENT SCIENCE, 1986, 32 (08) :909-932
[2]   THE U-LINE LINE BALANCING PROBLEM [J].
MILTENBURG, GJ ;
WIJNGAARD, J .
MANAGEMENT SCIENCE, 1994, 40 (10) :1378-1388
[3]  
Monden Y., 1993, TOYOTA PRODUCTION SY, V2nd