摘要
Tunnels are artificial underground spaces that provide a capacity for particular goals such as storage, underground transportation, mine development, power and water treatment plants, civil defence. This shows that the tunnel construction is a key activity in developing infrastructure projects. In many situations, tunnelling projects find themselves involved in the situations where unexpected conditions threaten the continuity of the project. Such situations can arise from the prior knowledge limited by the underground unknown conditions. Therefore, a risk analysis that can take into account the uncertainties associated with the underground projects is needed to assess the existing risks and prioritize them for further protective measures and decisions in order to reduce, mitigate and/or even eliminate the risks involved in the project. For this reason, this paper proposes a risk assessment model based on the concepts of fuzzy set theory to evaluate risk events during the tunnel construction operations. To show the effectiveness of the proposed model, the results of the model are compared with those of the conventional risk assessment. The results demonstrate that the fuzzy inference system has a great potential to accurately model such problems.
引用
收藏
页码:82 / 94
页数:13
相关论文
共 69 条
  • [1] Risk assessment of critical asset using fuzzy inference system
    Alidoosti, Ali
    Yazdani, Morteza
    Fouladgar, Mohammad Majid
    Basiri, Mohammad Hossein
    [J]. RISK MANAGEMENT-AN INTERNATIONAL JOURNAL, 2012, 14 (01): : 77 - 91
  • [2] Occupational risk of tunneling construction
    Aneziris, O. N.
    Papazoglou, I. A.
    Kallianiotis, D.
    [J]. SAFETY SCIENCE, 2010, 48 (08) : 964 - 972
  • [3] Anjuman S, 2012, J LOSS PREVENT PROCE, V3, P505, DOI DOI 10.1016/J.J1P.2011.12.007
  • [4] AYE ZZ, 2006, INT S UND EXC TUNN 2, P281
  • [5] Assessment of safety performance in Indian industries using fuzzy approach
    Beriha, G. S.
    Patnaik, B.
    Mahapatra, S. S.
    Padhee, S.
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (03) : 3311 - 3323
  • [6] Ceric A, 2011, TEH VJESN, V18, P529
  • [7] Development of a fuzzy FMEA based product design system
    Chin, Kwai-Sang
    Chan, Allen
    Yang, Jian-Bo
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 36 (7-8) : 633 - 649
  • [8] Dikmen I., 2007, International Journal of Project Management, V25, P494, DOI 10.1016/j.ijproman.2006.12.002
  • [9] Risk and risk analysis in rock engineering
    Einstein, HH
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 1996, 11 (02) : 141 - 155
  • [10] Fuzzy inference system for the risk assessment of liquefied natural gas carriers during loading/offloading at terminals
    Elsayed, Tarek
    [J]. APPLIED OCEAN RESEARCH, 2009, 31 (03) : 179 - 185