Provision of electromagnetic compatibility during creation of electrophysical facilities

被引:7
作者
Gerasimov, A. I. [1 ]
Gorkunov, V. S. [1 ]
Skripka, G. M. [1 ]
机构
[1] All Russia Sci Res Inst Expt Phys, Russian Fed Nucl Ctr, Inst Nucl & Radiat Phys, Nizhnii Novgorod 607190, Russia
关键词
42.25.Bs; 42.68.A; 41.20.Gz;
D O I
10.1134/S0020441206040166
中图分类号
T [工业技术];
学科分类号
08 [工学];
摘要
The main methods for noise suppression in high-power electrophysical facilities are presented: reasonable arrangement of equipment, suppression of noises at the locations of their appearance, shielding of systems against penetration of electromagnetic fields, development of several grounding circuits, improvement of the noise immunity of units, etc. This approach to the provision of electromagnetic compatibility is considered for the case of developing at the Russian Federal Nuclear Center-VNIIEF of the most powerful facility of the PULSAR system-the LIU-30 iron-free linear induction accelerator of pulsed electron beams with a record acceleration energy for electrophysical facilities of this type (40 McV, 100 kA, and 25 ns) and a maximum bremsstrahlung dose of 100 Gy at a 1-m distance from a target.
引用
收藏
页码:539 / 548
页数:10
相关论文
共 32 条
[1]
[Anonymous], 2004, IMPULSNAYA ENERGETIK
[2]
[Anonymous], EMP RAD PROTECTIVE T
[3]
BARNES JR, 1987, SYSTEM DESIGN INTERF
[4]
BOIKO NI, 2002, INSTRUM EXP TECH, P562
[5]
BOSAMYKIN VS, 1997, INSTRUM EXP TECH, P149
[6]
BOSAMYKIN VS, 1997, VYSOKIE PLOTNOSTI EN, P107
[7]
CAPACITIVELY AND INDUCTIVELY LOADED ANTENNAS IN A SOURCE-REGION EMP ENVIRONMENT [J].
BUSHELL, M ;
MANRIQUEZ, R ;
MERKEL, G ;
SCHARF, WD ;
SPOHN, D .
IEEE TRANSACTIONS ON NUCLEAR SCIENCE, 1980, 27 (06) :1839-1844
[8]
ERGLIS KE, 1969, PRIB TEKH EKSP, P5
[9]
GARMANOV A, 2003, SOVREM TEKHNOL AVTOM, P64
[10]
GARMANOV A, 2004, SOVREM TEKHNOL AVTOM, P62