Towards risk-based flood hazard management in the UK

被引:154
作者
Sayers, PB [1 ]
Hall, JW
Meadowcroft, IC
机构
[1] HR Wallingford, Engineers Syst & Management, Wallingford, Oxon, England
[2] Univ Bristol, Bristol BS8 1TH, Avon, England
关键词
floods & floodworks; management; risk & probability analysis;
D O I
10.1680/cien.2002.150.5.36
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Flood engineering in Britain is evolving from traditional approaches based on design standards to the development of risk-based decision-making, which involves taking account of a range of loads, defence system responses and impacts of flooding. Adopting such a 'whole systems' approach enables combinations of structural and non-structural approaches to be assessed and compared so resources can be targeted to best effect. Building on methods and know-how already in widespread use in river and coastal engineering, risk-analysis techniques are now being adopted in all areas-from high-level planning based on outline analysis to detailed designs using high-resolution simulation models. This paper explores some of the new techniques of this emerging approach to flood risk management.
引用
收藏
页码:36 / 42
页数:7
相关论文
共 27 条
[1]  
[Anonymous], 2000, FRAM PERF BAS DES 20
[2]  
[Anonymous], SPECIAL PUBLICATION
[3]  
[Anonymous], 2001, LEARN LIV RIV
[4]  
[Anonymous], 1999, INTERNAL CONTROL GUI
[5]  
BARNARD M, 1998, HLTH SAFETY ENG
[6]  
Beck Ulrich., 1992, Risk society: Towards a new modernity
[7]  
BYE P, 1998, FLOODS REPORT INDEPE, V2
[8]  
BYE P, 1998, FLOODS REPORT INDEPE, V1
[9]  
*DEP ENV FOOD RUR, 2000, NAT APPR ASS RISK FL
[10]  
*DEP ENV FOOD RUR, 2001, NAT APPR ASS RISK FL