Structural optimization of an energy supply system from economic viewpoint

被引:6
作者
Gamou, S
Ito, K
Yokoyama, R
Yoshida, S
机构
[1] Osaka Prefecture Univ, Dept Energy Syst Engn, Sakai, Osaka 5998531, Japan
[2] Kansai Elect Power Co Inc, R&D Ctr, Amagasaki, Hyogo 6610974, Japan
关键词
optimal planning; system structure; energy supply system; economic evaluation; parametric study;
D O I
10.1299/jsmeb.47.173
中图分类号
O414.1 [热力学];
学科分类号
摘要
An optimal planning method of system structure is proposed to determine kinds, numbers and capacities of equipment for an energy supply system installed in commercial and public buildings from economic viewpoint. In this method, they are determined together with maximum contract demands of utilities such as electricity and natural gas so as to minimize the annual total cost in consideration of system's annual operational strategies corresponding to seasonal and hourly energy demand requirements. A numerical study is carried out for an office building with total floor area of 15000 m(2). Through the study, the following are clarified: (a) the optimal system structure for the office building; (b) the economic effects of the optimal system compared to other typical energy supply systems; (c) the influence on the optimal system structure of the future efficiency improvement and initial capital cost reduction of equipment.
引用
收藏
页码:173 / 179
页数:7
相关论文
共 4 条
[1]
Brooke A., 1996, GAMS RELEASE 2 25 US
[2]
WITTE LC, 1988, IND ENERGY MANAGEMEN, P68
[3]
A MILP decomposition approach to large scale optimization in structural design of energy supply systems [J].
Yokoyama, R ;
Hasegawa, Y ;
Ito, K .
ENERGY CONVERSION AND MANAGEMENT, 2002, 43 (06) :771-790
[4]
OPTIMAL SIZING OF A GAS-TURBINE COGENERATION PLANT IN CONSIDERATION OF ITS OPERATIONAL STRATEGY [J].
YOKOYAMA, R ;
ITO, K ;
MATSUMOTO, Y .
JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME, 1994, 116 (01) :32-38