On the sure criticality of tasks in activity networks with imprecise durations

被引:56
作者
Chanas, S [1 ]
Dubois, D
Zielinski, P
机构
[1] Wroclaw Univ Technol, Inst Ind Engn & Management, PL-50370 Wroclaw, Poland
[2] Univ Toulouse 3, IRIT, F-31062 Toulouse, France
[3] Tech Univ Opole, Inst Math, PL-45036 Opole, Poland
来源
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART B-CYBERNETICS | 2002年 / 32卷 / 04期
关键词
fuzzy CPM; possibility and necessity; project management and scheduling;
D O I
10.1109/TSMCB.2002.1018760
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The notion of the. necessary criticality (both with respect to path and to activity) of, a network with imprecisely defined (by means of intervals or fuzzy intervals) activity duration times is introduced and analyzed. It is shown, in the interval case, that both the problem of asserting whether a given path is necessarily critical and the problem of determining an arbitrary necessarily critical path (more exactly, a subnetwork covering all the necessarily critical paths) are easy. The corresponding solution algorithms are proposed. However, the problem of evaluating whether a given activity is necessarily critical does not seem to be such. Certain conditions are formulated which in some situations (but not in all possible) allow evaluating the necessary criticality of activities. The results obtained for networks with interval activity duration times are generalized to the case of networks with fuzzy activity duration times. Two effective algorithms of calculating the degree of necessary criticality of a fixed path, as well as an algorithm of determining the paths that are necessarily critical to the maximum degree, are proposed.
引用
收藏
页码:393 / 407
页数:15
相关论文
共 46 条
[1]  
[Anonymous], 1988, FUZZY MATH MODELS EN
[2]  
[Anonymous], APPL FUZZY SET METHO
[3]  
[Anonymous], 1988, POSSIBILITY THEORY A
[4]   The computational complexity of the criticality problems in a network with interval activity times [J].
Chanas, S ;
Zielinski, P .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2002, 136 (03) :541-550
[5]   Critical path analysis in the network with fuzzy activity times [J].
Chanas, S ;
Zielinski, P .
FUZZY SETS AND SYSTEMS, 2001, 122 (02) :195-204
[6]   THE USE OF FUZZY VARIABLES IN PERT [J].
CHANAS, S ;
KAMBUROWSKI, J .
FUZZY SETS AND SYSTEMS, 1981, 5 (01) :11-19
[7]  
CHANAS S, 1987, OPTIMIZATION MODELS, P303
[8]  
CHANAS S, HDB FUZZY SETS SERIE, P249
[9]   FUZZY CONSTRAINTS IN JOB-SHOP SCHEDULING [J].
DUBOIS, D ;
FARGIER, H ;
PRADE, H .
JOURNAL OF INTELLIGENT MANUFACTURING, 1995, 6 (04) :215-234
[10]   Possibility theory in constraint satisfaction problems: Handling priority, preference and uncertainty [J].
Dubois, D ;
Fargier, H ;
Prade, H .
APPLIED INTELLIGENCE, 1996, 6 (04) :287-309