DSM Considered Probabilistic Reliability Evaluation and an Information System for Power Systems Including Wind Turbine Generators

被引:27
作者
Choi, Jaeseok [1 ]
Lim, Jintaek [1 ]
Lee, Kwang Y. [2 ]
机构
[1] Gyeongsang Natl Univ, Dept Elect Engn, ERI, RIGET, Jinju 660701, GN, South Korea
[2] Baylor Univ, Dept Elect & Comp Engn, Waco, TX 76798 USA
关键词
Composite power system reliability evaluation; grid considered reliability evaluation; multi-state model; web based online real-time integrated information system; wind turbine generator;
D O I
10.1109/TSG.2012.2234150
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
080906 [电磁信息功能材料与结构]; 082806 [农业信息与电气工程];
摘要
This paper proposes a methodology for evaluating the probabilistic reliability, considering demand side management (DSM) and web based on a daily interval reliability information system for a grid constrained composite power system including wind turbine generators(WTG). The proposed model can consider capacity limitations and transmission line unavailabilities and the operation of WTG modeled by multi-states. The importance of renewable energy sources is growing at a rapid rate due to environmental concerns. A web based online daily time interval reliability integrated information system (WORRIS) is applied using the methodology proposed in this paper. This paper describes the architecture of the WORRIS Version 7.0 system.
引用
收藏
页码:425 / 432
页数:8
相关论文
共 16 条
[1]
Billinton R., 1994, RELIABILITY EVALUATI, DOI DOI 10.1007/978-1-4615-7731-7
[2]
Billinton R., 2000, P 14 POW SYST COMP C
[3]
Billinton R, 2013, Reliability assessment of electrical power systems using Monte Carlo methods
[4]
Multistate wind energy conversion system models for adequacy assessment of generating systems incorporating wind energy [J].
Billinton, Roy ;
Gao, Yi .
IEEE TRANSACTIONS ON ENERGY CONVERSION, 2008, 23 (01) :163-170
[5]
Cho K., 2012, P PMAPS2012 IST TURK
[6]
Probabilistic Reliability Based Grid Expansion Planning of Power System Including Wind Turbine Generators [J].
Cho, Kyeonghee ;
Park, Jeongje ;
Choi, Jaeseok .
JOURNAL OF ELECTRICAL ENGINEERING & TECHNOLOGY, 2012, 7 (05) :698-704
[7]
Development of a nodal effective load model considering transmission system element unavailabilities [J].
Choi, J ;
Billinton, R ;
Futuhi-Firuzabed, M .
IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 2005, 152 (01) :79-89
[8]
Probabilistic reliability criterion for planning transmission system expansions [J].
Choi, J. ;
Mount, T. D. ;
Thomas, R. J. ;
Billinton, R. .
IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 2006, 153 (06) :719-727
[9]
Choi J., 2001, P IEEE PES GEN M VAN
[10]
Claudio H. C., 1999, P N AM POW S NAPS SA