Hybrid intelligence utilization for construction site layout

被引:22
作者
Zhang, JP [1 ]
Liu, LH
Coble, RJ
机构
[1] Tsing Hua Univ, Dept Civil Engn, Beijing 100084, Peoples R China
[2] Univ Florida, Sch Bldg Construct, ME Rinker SR, Ganuesuille, FL USA
关键词
construction site layout; expert system; artificial neural networks; hybrid intelligence;
D O I
10.1016/S0926-5805(01)00071-1
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
in case of the shortages and limitations in solving the problem of construction site layout, there is a need for simulation prior to work commencement. By using a combination of Expert System (ES) and Artificial Neural Networks (ANN) technology, a new methodology for solving this problem has been developed. This system applies hybrid intelligence technology, and is presented in this text. Based on site investigation and analysis of effective factors in site layout, a hybrid intelligence model and system, named Hybrid System for Site Layout (HSSL), was developed. The evolution of this concept and its mechanism of integration are delineated in this text, so as to allow the reader to have an overview of its content, while at the same time providing for the specifics of how the system operates. (C) 2002 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:511 / 519
页数:9
相关论文
共 7 条
[1]  
GUANGMING L, 1998, THESIS TSINGHUA U BE
[2]  
Hendrickson C., 1987, J COMPUT CIVIL ENG, V1, P253
[3]  
LIU LH, 1999, THESIS TSINGHUA U BE
[4]   CONSCHED - EXPERT SYSTEM FOR SCHEDULING OF MODULAR CONSTRUCTION PROJECTS [J].
SHAKED, O ;
WARSZAWSKI, A .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1992, 118 (03) :488-506
[5]  
TOMMELEIN ID, 1994, COMP CIV ENG 1 C, P1172
[6]   CONSTRUCTION-SITE LAYOUT USING ANNEALED NEURAL-NETWORK [J].
YEH, IC .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 1995, 9 (03) :201-208
[7]  
ZHANG JP, 1996, THESIS HONG KONG POL