Generation adequacy assessment of power systems by time series and fuzzy neural network

被引:16
作者
Amjady, Nima [1 ]
机构
[1] Semnan Univ, Dept Elect Engn, Semnan, Iran
关键词
fuzzy neural network (FNN); generation adequacy assessment; time series;
D O I
10.1109/TPWRS.2006.879250
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
In this paper, a new hybrid method for generation adequacy assessment of power systems is proposed. This method is based on the combination of time series and fuzzy neural network (FNN). The time series, as a spectrum analyzer, is used to determine the effective input features. The generation adequacy index of loss of energy expectation (LOEE) is selected as the output feature. These input and output features construct the training samples of the FNN. After training, it constructs a mapping function between input and output features, used to predict the adequacy index of the next time interval. Obtained results from extensive testing of the whole method on two practical power systems confirm the validity of the developed approach. It is shown that the proposed method can provide more accurate results than the conventional techniques, such as Monte Carlo simulation, time series, and artificial neural networks.
引用
收藏
页码:1340 / 1349
页数:10
相关论文
共 20 条
[1]   Evaluation of power systems reliability by an artificial neural network [J].
Amjady, N ;
Ehsan, M .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (01) :287-292
[2]   A framework of reliability assessment with consideration effect of transient and voltage stabilities [J].
Amjady, N .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2004, 19 (02) :1005-1014
[3]   Short-term hourly load forecasting using time-series modeling with peak load estimation capability [J].
Amjady, N .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2001, 16 (04) :798-805
[4]  
AMJADY N, 2000, CAN J ELECT COMPUT E, V22, P102
[5]  
Amjady N., 2002, INTRO INTELLIGENT SY
[6]   TRANSMISSION SYSTEM RELIABILITY EVALUATION USING MARKOV PROCESSES [J].
BILLINTO.R ;
BOLLINGE.KE .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1968, PA87 (02) :538-&
[7]  
Billinton R., 1984, Reliability Evaluation of Power Systems, DOI DOI 10.1007/978-1-4615-7731-7
[8]   Generation rescheduling methods to improve power transfer capability constrained by small-signal stability [J].
Chung, CY ;
Wang, L ;
Howell, F ;
Kundur, P .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2004, 19 (01) :524-530
[9]   Reliability and reserve in competitive electricity market scheduling [J].
Flynn, M ;
Sheridan, WP ;
Dillon, JD ;
O'Malley, MJ .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2001, 16 (01) :78-87
[10]  
Gaver D.P., 1964, IEEE Trans. Power Appar. Syst, V83, P727, DOI DOI 10.1109/TPAS.1964.4766068