摘要
This paper reports the results of a study of the use of heterogeneous dispatching rules for the scheduling of work in a job shop. The methodology employed included discrete event simulation, using rule combinations determined by prior genetic algorithm searches and generalization using neural networks. Eight dispatching rules were considered, including first in first out (FIFO), earliest due date (EDD), shortest processing time (SPT), slack/ number of operations (SLK), critical ratio (CR), modified due date (MDD), modified operation due date (MOD), and apparent tardiness cost (ATC). A three-machine job shop was studied, in which three work organizations were employed, pure flow (fixed sequence), pure job shop (random sequence), and a hybrid shop where flow is random but with unequal probabilities. Three levels of machine loading were used and average tardiness was used as the performance measure. In most cases, modified due date and apparent tardiness cost were the best rules. The application of the best rules effected the results primarily when applied to bottleneck machines or the first machine in a pure flow shop. Nearly any other rule was acceptable on non-bottleneck machines except FIFO and CR, which consistently perform poorly. No major advantage of mixing rules was found.
引用
收藏
页码:351 / 361
页数:11
相关论文
共 18 条
[1]  
[Anonymous], 1979, Computers and Intractablity: A Guide to the Theoryof NP-Completeness
[2]  
Baker KR., 1974, Introduction to Sequencing and Scheduling
[3]   A STATE-OF-THE-ART SURVEY OF DISPATCHING RULES FOR MANUFACTURING JOB SHOP OPERATIONS [J].
BLACKSTONE, JH ;
PHILLIPS, DT ;
HOGG, GL .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1982, 20 (01) :27-45
[4]  
CASKEY KR, 1993, THESIS U WASHINGTON
[5]  
CHAPMAN BL, 1986, THESIS U TEXAS AUSTI
[6]  
CHRYSSOLOURIS G, 1991, J MANUGACTURING SYST, V2, P166
[7]  
CONWAY RW, 1964, RM3789PR RAND CORP M
[8]  
Conway RW., 1967, THEORY SCHEDULING
[9]   REVIEW OF SEQUENCING RESEARCH [J].
DAY, JE ;
HOTTENSTEIN, MP .
NAVAL RESEARCH LOGISTICS QUARTERLY, 1970, 17 (01) :11-+
[10]  
Goldratt E.M., 1984, GOAL