Downside risks in construction projects developed by the civil service:: The case of Spain

被引:21
作者
de la Cruz, M. Pilar
del Cano, Alfredo
de la Cruz, Elisa
机构
[1] Univ A Coruna, Escuela Politecn Super, Catedrat, Ferrol 15403, Spain
[2] Univ Valladolid, Escuela Univ Estudios Empresariales, Soria 42001, Spain
关键词
Case reports; Construction management; Contract management; Contracts; Project management; Public works; Risk management; Spain;
D O I
10.1061/(ASCE)0733-9364(2006)132:8(844)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The purpose of the work summarized here was to improve the efficiency of the construction project management processes performed by the Spanish civil service, identifying and analyzing the main risks in these kinds of projects, and also establishing potential risk responses. The scope of this effort included a list of 96 risk events, categorized and prioritized first by impact, then by frequency. The most relevant ones are related to issues such as an inadequate prequalification system, insufficient training of public servants, or political considerations prevailing over real needs, among others. A total of 117 potential risk responses were identified, categorized, and prioritized by potential efficiency and difficulty of implementation. Each risk event was associated to a set of potential responses. The paper includes the top 15 risk events with its main potential responses, including qualitative assessments. A survey was carried out among Spanish public servants working in construction projects, to validate risk identification and to obtain a qualitative assessment. Moreover, a Delphi analysis was developed to validate the risk response identification and obtain a qualitative assessment. One of the conclusions is that small and medium-sized Spanish civil service agencies should work toward increasing their maturity in managing projects and, mainly, project risks.
引用
收藏
页码:844 / 852
页数:9
相关论文
共 29 条
[1]  
[Anonymous], 2004, A guide to the project management body of knowledge, V3rd
[2]  
[Anonymous], 1997, INT J PROJECT BUSINE
[3]  
Barzelay M., 2001, NEW PUBLIC MANAGEMEN
[4]  
CHITTENDEN RA, 1997, PM NETWORK, V11, P25
[5]  
Cox A., 1998, STRATEGIC PROCUREMEN
[6]   EVALUATION OF COMPETITIVE BIDS [J].
CROWLEY, LG ;
HANCHER, DE .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1995, 121 (02) :238-245
[7]   RISK ASSESSMENT OF COMPETITIVE PROCUREMENT [J].
CROWLEY, LG ;
HANCHER, DE .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1995, 121 (02) :230-237
[8]   Integrated methodology for project risk management [J].
del Caño, A ;
de la Cruz, MP .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2002, 128 (06) :473-485
[9]  
DELACRUZ MP, 1998, THESIS TU MADRID SPA
[10]  
DELACRUZ MP, 2001, ESTUD CONSTR TRANSP, V93, P39