共 10 条
[1]
[Anonymous], 1986, ELECT POWER DISTRIBU
[2]
Crowford D, 1975, IEEE T PAS, V94, P230
[3]
LIEBMAN L, 1985, MODELING OPTIMIZATIO
[4]
INTERACTIVE PROCEDURE FOR SIZING AND TIMING DISTRIBUTION SUBSTATIONS USING OPTIMIZATION TECHNIQUES
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1974, PA93 (05)
:1281-1286
[6]
OPTIMAL DISTRIBUTION SUBSTATION AND PRIMARY FEEDER PLANNING VIA THE FIXED CHARGE NETWORK FORMULATION
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1982, 101 (03)
:602-609
[7]
TEMRAZ H, 1994, MIDD EAST POW CONJ M
[8]
Temraz H. K., 1992, Canadian Journal of Electrical and Computer Engineering, V17, P34
[10]
A BRANCH AND BOUND MODEL FOR CHOOSING OPTIMAL SUBSTATION LOCATIONS
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1981, 100 (05)
:2683-2688