Use of load control to regulate voltage on distribution networks with embedded generation

被引:78
作者
Scott, NC
Atkinson, DJ
Morrell, JE
机构
[1] Newcastle Univ, Dept Elect & Elect Engn, Newcastle Upon Tyne NE1 7RU, Tyne & Wear, England
[2] NEDL, Houghton Le Spring, England
关键词
load management; power distribution; voltage control; wind energy; wind power generation;
D O I
10.1109/TPWRS.2002.1007926
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Since 1994, Econnect has, in conjunction with Northern Electric PLC, investigated the use of consumer load control as a new and innovative method to actively regulate distribution system voltage when affected by the operation of embedded generators. There are a number of issues that can limit the installed capacity of embedded generators; these are often voltage related and the most common is steady-state voltage rise. A number of techniques can be applied to limit steady-state voltage rise, some of which are static in time (e.g., network re-inforcement) and some dynamic (e.g., power factor control). This paper discusses the issue of excess steady-state voltage rise and the methods of limitation that can be applied with specific reference to wind generation. The new and innovative approach using consumer load control is discussed and compared with the existing methods using a simulation case study.
引用
收藏
页码:510 / 515
页数:6
相关论文
共 19 条
[1]  
BERGMAN S, 1997, P CIRED
[2]  
BITSCH R, 1998, MODERN POWER SYST, P19
[3]  
*CENELEC HD, 1988, 472S1 CENELEC HD
[4]  
*EC LTD, 1995, W3300421REP
[5]  
*EUR STAND, 1994, 50160 EN
[6]   PROBABILISTIC LOAD FLOW IN DISTRIBUTION-SYSTEMS CONTAINING DISPERSED WIND POWER-GENERATION [J].
HATZIARGYRIOU, ND ;
KARAKATSANIS, TS ;
PAPADOPOULOS, M .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1993, 8 (01) :159-165
[7]  
HATZIARGYRIOU ND, 1997, P CIRED
[8]  
Jorgensen P, 1998, INT C HARMON QUAL PO, P1146, DOI 10.1109/ICHQP.1998.760200
[9]  
LORITO F, 1997, P CIRED
[10]  
SaadSaoud Z, 1995, WIND ENERGY CONVERSION 1995, P347