Lot streaming with detached setups in three-machine flow shops

被引:31
作者
Chen, J [1 ]
Steiner, G [1 ]
机构
[1] MCMASTER UNIV,SCH BUSINESS,HAMILTON,ON L8S 4M4,CANADA
关键词
scheduling; flow shop; lot streaming;
D O I
10.1016/S0377-2217(96)00091-4
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Lot streaming is the process of splitting a job or lot to allow overlapping between successive operations in a multistage production system. This use of transfer lots usually results in a shorter makespan for the corresponding schedule. In this paper, we study the structural properties of schedules which minimize the makespan for a single job with detached setup times in a flow shop. Although the structure of the optimal schedules is more complex than in the case with no setups [9], it is possible to find the optimal solution with s sublets in O(log s) time for the three-machine case.
引用
收藏
页码:591 / 611
页数:21
相关论文
共 27 条
[1]   A COMPARATIVE-STUDY OF LOT STREAMING PROCEDURES [J].
BAKER, KR ;
JIA, D .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1993, 21 (05) :561-566
[2]   SOLUTION PROCEDURES FOR THE LOT-STREAMING PROBLEM [J].
BAKER, KR ;
PYKE, DF .
DECISION SCIENCES, 1990, 21 (03) :475-491
[3]  
BAKER KR, 1993, 297 DARTM COLL TUCK
[4]  
BAKER KR, 1992, ELEMENTS SEQUENCING
[5]   UNIT SIZED TRANSFER BATCH SCHEDULING WITH SETUP TIMES [J].
CETINKAYA, FC ;
KAYALIGIL, MS .
COMPUTERS & INDUSTRIAL ENGINEERING, 1992, 22 (02) :177-183
[7]  
CETINKAYA FC, 1994, 9424 PURD U IND ENG
[8]  
FOX RE, 1983, INVENTORIES PRODUCTI, V3
[9]   LOT STREAMING IN 3-STAGE PRODUCTION PROCESSES [J].
GLASS, CA ;
GUPTA, JND ;
POTTS, CN .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 75 (02) :378-394
[10]  
Goldratt E.M., 1986, RACE, V1st