Team-oriented assembly system design: A new approach

被引:31
作者
Bukchin, J
Darel, E
Rubinovitz, J
机构
[1] Department of Industrial Engineering, Faculty of Engineering, Tel Aviv University
关键词
team-oriented assembly; new design method;
D O I
10.1016/S0925-5273(97)00060-1
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A new design methodology for team-based assembly systems is presented in this paper. Team-oriented assembly (TOA) systems support the objectives of modern assembly systems, while creating a more satisfactory working environment. Each team is defined as semi-autonomous with well-defined responsibilities. Design parameters are: number of teams, precedence relationship between them, team size, and work content of each team. The problem-solving approach is product oriented and based on assigning Bill of Material(BOM) elements to reams. Performance measures are introduced, and a hierarchical design approach which consists of two stages is presented.
引用
收藏
页码:47 / 57
页数:11
相关论文
共 18 条
[1]  
[Anonymous], PRODUCTION OPERATION
[2]  
[Anonymous], 1982, SEARCH EXCELLENCE LE
[3]   A SURVEY OF EXACT ALGORITHMS FOR THE SIMPLE ASSEMBLY LINE BALANCING PROBLEM [J].
BAYBARS, I .
MANAGEMENT SCIENCE, 1986, 32 (08) :909-932
[4]  
Black J.T., 1991, DESIGN FACTORY FUTUR
[5]  
Burbidge JL., 1989, Production Flow Analysis for Planning Group Technology
[6]  
CHAKRAVARTY AK, 1985, MANAGE SCI, V31, P9
[7]  
DAREL EM, 1991, ICPR 1991 WORKSH 1 1
[8]  
FREMERY F, 1991, PRODUCTION RES APPRO
[9]  
Gosh S., 1989, INT J PROD RES, V27, P637
[10]   FLEXIBILITY AND PRODUCTIVITY IN COMPLEX PRODUCTION PROCESSES [J].
GUSTAVSSON, SO .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1984, 22 (05) :801-808