On power system controlled separation

被引:42
作者
Adibi, M. M. [1 ]
Kafka, R. J.
Maram, Sandeep
Mili, Lamine M.
机构
[1] IRD Corp, Bethesda, MD 20827 USA
[2] Pepco Holdings Inc, Bethesda, MD 20827 USA
[3] Virginia Polytech Inst & State Univ, Blacksburg, VA 24061 USA
基金
美国国家科学基金会;
关键词
controlled separation; graceful degradation; out-of-step blocking; system separation; transfer tripping;
D O I
10.1109/TPWRS.2006.881139
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 [电气工程]; 0809 [电子科学与技术];
摘要
This paper describes verification of five conjectures related to power system controlled separation. It attempts to verify that the location of uncontrolled separation (loss of synchronism or out-of-step operation) is independent of the location and severity (short-circuit duty or duration) of the initial faults, that the location depends on the prevailing network configuration and load level, and that it takes place one operation at a time (cascades). Verification of these conjectures would allow controlled separation during a disturbance in real-time, using the present communication and protection systems, and results in a minimal load and generation imbalance. Two actual power systems were used, a 50-bus system to establish the procedure for controlled separation and a 640-bus interconnection to apply the procedure. Data representing static and dynamic behavior of the two power systems were obtained from the operating utilities, and the many required simulations were conducted using EPRI Power System Analysis Package (including IPFLOW and ETMSP programs).
引用
收藏
页码:1894 / 1902
页数:9
相关论文
共 30 条
[1]
ABIDI MM, 1969, P IEEE POW ENG SOC P
[2]
ABIDI MM, 2000, EPP1663C673 EPRI
[3]
ABIDI MM, 1974, P IEEE, V62, P951
[4]
PROTECTIVE SYSTEM ISSUES DURING RESTORATION [J].
ADIBI, MM ;
MILANICZ, DP .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1995, 10 (03) :1492-1497
[5]
LOCAL LOAD SHEDDING [J].
ADIBI, MM ;
THORNE, DK .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1988, 3 (03) :1220-1229
[6]
Frequency response of prime movers during restoration [J].
Adibi, MM ;
Borkoski, JN ;
Kafka, RJ ;
Volkmann, TL .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (02) :751-756
[7]
A scheme for controlled islanding to prevent, subsequent blackout [J].
Ahmed, SS ;
Sarker, NC ;
Khairuddin, AB ;
Ghani, MRBA ;
Ahmad, H .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2003, 18 (01) :136-143
[8]
*BLACK, 2003, FIN REP AUG 14 2003
[9]
POWER SYSTEM DYNAMIC EQUIVALENTS [J].
CHANG, A ;
ADIBI, MM .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1970, PA89 (08) :1737-&
[10]
COLEMAN J, 2004, SYSTEM RESTORATION N