Pantograph/catenary dynamics and control

被引:181
作者
Poetsch, G
Evans, J
Meisinger, R
Kortum, W
Baldauf, W
Veitl, A
Wallaschek, J
机构
[1] DB AG, Forschungs- und Technologiezentrum, 80939 München
[2] BR Research Ltd., Derby DE24 8YB, London Road
[3] Fachhochschule Nürnberg, Box 210320
[4] DLR, Inst. for Robotics and Syst. Dynam.
[5] Heinz Nixdorf Institut, 33102 Paderborn
关键词
D O I
10.1080/00423119708969353
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
The pantograph-catenary system with its dynamic behaviour turned out to be a crucial component for new train systems required to run at higher speeds. With the present systems, operational limitations have to be accepted when running with several pantographs in the train set, when tilting trains are employed, when running on low quality catenary sections or when stricter noise reduction regulations are forcing lower noise emissions also for the pantographs. This paper gives an overview of the methods to describe the catenary and the pantograph system dynamics. Furthermore, aspects concerning the interaction between current collectors and overhead equipment, the acquisition of the model data and the verification are presented. Finally various constructions of passive pantographs and proposals for active control concepts are discussed.
引用
收藏
页码:159 / 195
页数:37
相关论文
共 56 条
[1]  
ABBOTT MR, 1967, 67156 ROY AIRCR EST
[2]  
ANDREWS HI, 1964, I MECH ENG P, V179, P809
[3]  
BARLAGE J, 1996, THESIS TU BRAUNSCHWE
[4]  
Bauer K.-H., 1979, Zeitschrift fur Eisenbahnwesen und Verkehrstechnik, V103, P365
[5]  
BEADLE AR, 1975, ROYAL ENG J, P72
[6]  
BECKER C, 1995, EISENBAHNTECHNISCHE, V44, P64
[7]  
BELYAEV IA, 1974, TRIEBFAHRZEUGE SCHIE
[8]  
BETTS AI, 1987, IEE C EL RAILW NEW C
[9]  
Bianchi C., 1991, Elektrische Bahnen, V89, P429
[10]  
BRAND W, 1995, THESIS TU MUNCHEN