Study of impacts, of physical contracts and financial contracts on bidding strategies of GENCOs

被引:13
作者
Chen, XL
He, Y
Song, YH [1 ]
Nakanishi, Y
Nakanishi, C
Takahashi, S
Sekine, Y
机构
[1] Brunel Univ, Brunel Inst Power Syst, Uxbridge UB8 3PH, Middx, England
[2] Sichuan Elect Power Co, Chengdu, Sichuan, Peoples R China
[3] Fuji Elect Grp, Fuji, Shizuoka, Japan
关键词
electricity markets; bidding strategy; contract; risk management;
D O I
10.1016/j.ijepes.2004.06.001
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper studies the impacts of physical contracts and financial contracts on the bidding strategies of GENCOs, including Physical Bilateral Contracts, Contracts for Difference (CfDs), Call Options and Put Options under discriminatory pricing mechanism. The integrated bidding decision model is applied, which has three main modules-probabilistic local marginal price simulator, market-oriented unit commitment model and multi-criteria decision system. The numerical results show that the GENCO will choose different bidding strategies if it holds different types of contract. The results also suggest that CfDs have the best performance for risk alleviation. (C) 2004 Elsevier Ltd. All rights reserved.
引用
收藏
页码:715 / 723
页数:9
相关论文
共 18 条
[1]   Financial risk management in a competitive electricity market [J].
Bjorgan, R ;
Liu, CC ;
Lawarrée, J .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (04) :1285-1291
[2]   Pricing flexible electricity contracts [J].
Bjorgan, R ;
Song, HL ;
Liu, CC ;
Dahlgren, R .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2000, 15 (02) :477-482
[3]   Studies of bilateral contracts with respect to steady-state security in a deregulated environment [J].
Cheng, JWM ;
Galiana, FD ;
McGillis, DT .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1998, 13 (03) :1020-1025
[4]   The economics of electricity hedging and a proposed modification for the futures contract for electricity [J].
Collins, RA .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2002, 17 (01) :100-107
[5]   Auction design in day-ahead electricity markets [J].
Contreras, J ;
Candiles, O ;
de la Fuente, JI ;
Gómez, T .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2001, 16 (01) :88-96
[6]   OPTIONAL FORWARD CONTRACTS FOR ELECTRIC-POWER MARKETS [J].
GEDRA, TW .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1994, 9 (04) :1766-1773
[7]   MARKETS AND PRICING FOR INTERRUPTIBLE ELECTRIC-POWER [J].
GEDRA, TW ;
VARAIYA, PP .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1993, 8 (01) :122-128
[8]   Integrated resource scheduling and bidding in the deregulated electric power market: New challenges [J].
Guan, XH ;
Luh, PB .
DISCRETE EVENT DYNAMIC SYSTEMS-THEORY AND APPLICATIONS, 1999, 9 (04) :331-350
[9]   Integrated bidding strategies by optimal response to probabilistic locational marginal prices [J].
He, Y ;
Song, YH .
IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 2002, 149 (06) :633-639
[10]   Bidding strategies based on bid sensitivities in generation auction markets [J].
He, Y ;
Song, YH ;
Wang, XF .
IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 2002, 149 (01) :21-26