CarbFix - public engagement and transparency

被引:8
作者
Aradottir, Edda Sif Pind [1 ]
Hjalmarsson, Eirikur [1 ]
机构
[1] Reykjavik Energy, Bcejarhols I, IS-110 Reykjavik, Iceland
来源
CARBON IN NATURAL AND ENGINEERED PROCESSES | 2018年 / 146卷
基金
欧盟地平线“2020”;
关键词
CarbFix2; CCS; public acceptance; stakeholder engagement;
D O I
10.1016/j.egypro.2018.07.015
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The history of the CarbFix project spans 12 years. Throughout all this time, CarbFix has not faced problems with public acceptance in relation to carbon capture and storage (CCS) activities. This is noteworthy, as the project's operations are located at Hellisheioi Geothermal Power Plant, which has been contested and scrutinized. It could even be argued that CarbFix has played an important part in increasing the Hellisheioi Plant's acceptance. This paper describes the framework of stakeholder engagement and transparency in relation to industrial scale operations within CarbFix and the impact it has had public acceptance. Copyright (C) 2018 Elsevier Ltd. All rights reserved.
引用
收藏
页码:115 / 120
页数:6
相关论文
共 7 条
[1]  
Bessason B, 2012, PROTOCOL INDUCED SEI
[2]  
Gunnarsson G., 2013, GEOTHERMAL RESOUR CO, V37, P1019
[3]  
Hartmann J., 2018, HELLISHEIOI GEOTHERM
[4]  
Hellsing V. U. L., 2018, NATL INVENTORY REPOR
[5]  
Sigfusson B., 2018, ENERGY PROCEDIA
[6]  
Theakston F., 2000, Air Quality Guidelines for Europe World, V2nd
[7]  
Thorsteinsson H., 2014, Trans.-Geotherm. Resour. Council, V38, P879