Power system structure optimization subject to reliability constraints

被引:135
作者
Lisnianski, A [1 ]
Levitin, G [1 ]
BenHaim, H [1 ]
Elmakis, D [1 ]
机构
[1] ISRAEL ELECT CORP LTD,RELIABIL DEPT,R&D DIV,IL-31000 HAIFA,ISRAEL
关键词
genetic algorithm; redundancy optimization; universal generating function;
D O I
10.1016/S0378-7796(96)01106-6
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 [电气工程]; 0809 [电子科学与技术];
摘要
The problem of the optimization of the structure of a power system where redundant elements are included in order to provide a desired level of reliability is considered. A procedure which determines the minimal cost series-parallel system configuration is proposed. In this procedure, system elements are chosen from a list of products available on the market and the number of such elements is determined for each system component. The elements are characterized by their capacity, availability and cost. System reliability is defined as the ability to satisfy consumer demand which is represented as a piecewise cumulative load curve. To evaluate system reliability, a fast procedure is developed which is based on a universal generating function. A genetic algorithm is used as an optimization technique. An example of the redundancy optimization of a power station coal feeding system is presented. (C) 1996 Elsevier Science S.A.
引用
收藏
页码:145 / 152
页数:8
相关论文
共 15 条
[1]
AUSTIN S, 1990, AI EXPERT MAR, P49
[2]
BERGLEY S, 1995, NEWSWEEK 0508, P46
[3]
BILLINTON R, 1984, RELIABILITY POWER SY
[4]
Goldberg DE, 1989, GENETIC ALGORITHMS S
[5]
OPTICAL SECTIONALIZER ALLOCATION IN ELECTRIC DISTRIBUTION-SYSTEMS BY GENETIC ALGORITHM [J].
LEVITIN, G ;
MAZALTOV, S ;
ELMAKIS, D .
ELECTRIC POWER SYSTEMS RESEARCH, 1994, 31 (02) :97-102
[6]
GENETIC ALGORITHM FOR OPEN-LOOP DISTRIBUTION-SYSTEM DESIGN [J].
LEVITIN, G ;
MAZALTOV, S ;
ELMAKIS, D .
ELECTRIC POWER SYSTEMS RESEARCH, 1995, 32 (02) :81-87
[7]
LISNIANSKI A, 1994, P 10 INT C ISR SOC Q, P313
[8]
GENETIC ALGORITHMS IN OPTIMIZATION OF SYSTEM RELIABILITY [J].
PAINTON, L ;
CAMPBELL, J .
IEEE TRANSACTIONS ON RELIABILITY, 1995, 44 (02) :172-178
[9]
Ross S. M., 1993, INTRO PROBABILITY MO
[10]
UNIT COMMITMENT BY GENETIC ALGORITHM AND EXPERT-SYSTEM [J].
SHEBLE, GB ;
MAIFELD, TT .
ELECTRIC POWER SYSTEMS RESEARCH, 1994, 30 (02) :115-121