Improving operating room efficiency through process redesign

被引:155
作者
Harders, Maureen
Malangoni, Mark A.
Weight, Steven
Sidhu, Tejbir
机构
[1] Case Western Reserve Univ, Sch Med, MetroHlth Med Ctr, Dept Anesthesiol, Cleveland, OH 44109 USA
[2] Case Western Reserve Univ, Sch Med, MetroHlth Med Ctr, Dept Surg, Cleveland, OH 44109 USA
[3] Case Western Reserve Univ, Sch Med, MetroHlth Med Ctr, Dept Obstet Gynecol, Cleveland, OH 44109 USA
关键词
D O I
10.1016/j.surg.2006.06.018
中图分类号
R61 [外科手术学];
学科分类号
摘要
Background. Operating rooms (ORs) are important resources for patient care and revenue, yet a significant portion of OR time is taken up by nonoperative activities. We hypothesized that redesigning the process that occurs between operations would lead to a decrease in nonoperative time (NOT = room turnover time plus anesthesia induction and emergence time). Methods. Following a 3-month multidisciplinary planning process, a prospective study to reduce NOT was initiated in 2 of 17 ORs at a tertiary care academic medical center. Unlike previous reports, which have limited the number of participants, we constructed a process that was restricted only by case duration. The plan focused on minimizing nonoperative tasks in the OR, effecting parallel performance of activities, and reducing nonclinical disruptions. Eligible cases were those with an estimated operative time of 2 hours or less. A target NOT of 35 minutes was established. Cases of similar duration in the remaining ORs served as a concurrent control group. Results. Twenty-three surgeons, 13 anesthesiologists, and 11 nurses worked in the project ORs over a 3-month period. Residents participated in all cases. There was 0 significant reduction in NOT (42.2 +/- 12.9 vs 65 +/- 21.7 minutes), turnover time (264 +/- 11.2 vs 42.8 +/- 21.7 minutes), and anesthesia-related time (16.9 vs 21.9 minutes, all P <. 001) in the project rooms compared with cases of similar duration in control ORs. Process-related delays were identified in 70% of cases when NOT exceeded the 35-minute target. Conclusions. These results demonstrate that a coordinated multidisciplinary process redesign can significantly reduce NOT This Process is applicable to most ORs and has optimal benefit for cases of 2 hours or less in duration. The high percentage of residual process-related delays suggests that further improvements can be anticipated.
引用
收藏
页码:509 / 514
页数:6
相关论文
共 8 条
[1]   Interdisciplinary work flow assessment and redesign decreases operating room turnover time and allows for additional caseload [J].
Cendán, JC ;
Good, M .
ARCHIVES OF SURGERY, 2006, 141 (01) :65-69
[2]   DECREASES IN ANESTHESIA-CONTROLLED TIME CANNOT PERMIT ONE ADDITIONAL SURGICAL OPERATION TO BE RELIABLY SCHEDULED DURING THE WORKDAY [J].
DEXTER, F ;
COFFIN, S ;
TINKER, JH .
ANESTHESIA AND ANALGESIA, 1995, 81 (06) :1263-1268
[3]   Increasing operating room efficiency through parallel processing [J].
Friedman, DM ;
Sokal, SM ;
Chang, YH ;
Berger, DL .
ANNALS OF SURGERY, 2006, 243 (01) :10-14
[4]   Overlapping induction of anesthesia - An analysis of benefits and costs [J].
Hanss, R ;
Buttgereit, B ;
Tonner, PH ;
Bein, B ;
Schleppers, A ;
Steinfath, M ;
Scholz, J ;
Bauer, M .
ANESTHESIOLOGY, 2005, 103 (02) :391-400
[5]   Assessing operating room efficiency and parallel processing [J].
Malangoni, MA .
ANNALS OF SURGERY, 2006, 243 (01) :15-16
[6]   Deliberate perioperative systems design improves operating room throughput [J].
Sandberg, WS ;
Daily, B ;
Egan, M ;
Stahl, JE ;
Goldman, JM ;
Wiklund, RA ;
Rattner, D .
ANESTHESIOLOGY, 2005, 103 (02) :406-418
[7]   Introducing new technology into the operating room: Measuring the impact on job performance and satisfaction [J].
Stahl, JE ;
Egan, MT ;
Goldman, JM ;
Tenney, D ;
Wiklund, RA ;
Sandberg, WS ;
Gazelle, S ;
Rattner, DW .
SURGERY, 2005, 137 (05) :518-526
[8]   Use of anesthesia induction rooms can increase the number of urgent orthopedic cases completed within 7 hours [J].
Torkki, PM ;
Marjamaa, RA ;
Torkki, MI ;
Kallio, PE ;
Kirvelä, OA .
ANESTHESIOLOGY, 2005, 103 (02) :401-405