Dynamic Cost Reduction Through Process Improvement in Assembly Networks

被引:93
作者
Bernstein, Fernando [1 ]
Koek, A. Guerhan [1 ]
机构
[1] Duke Univ, Fuqua Sch Business, Durham, NC 27708 USA
关键词
assembly systems; process improvement; dynamic games; procurement; supplier management; SUPPLY CHAINS; QUALITY IMPROVEMENT; PROCESS INNOVATION; CHANNEL STRUCTURE; LEARNING-CURVE; COMPETITION; SYSTEMS; PRICE; MODEL;
D O I
10.1287/mnsc.1080.0961
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider a decentralized assembly system in which a buyer purchases components from several first-tier suppliers. We examine the dynamics of suppliers' investments in cost-reduction initiatives over the life cycle of a product under different procurement approaches. We model the suppliers' investment decisions under cost-contingent contracts, with wholesale prices determined on the basis of the prevailing component costs, as a dynamic game in closed-loop strategies. We show that there always exists an equilibrium in which the suppliers' investments are synchronized, that is, in each period either all suppliers invest in process improvement or no supplier does. We also consider target-price contracts, under which the assembler announces the rate of component cost reduction to be achieved over the product's life cycle at the beginning of the contractual relationship. We show that target-price contracts lead to higher investment levels and profits if the rates are properly specified. In general, the equilibrium investments of the suppliers are lower than those under centralized control. The buyer can eliminate this inefficiency by subsidizing a certain fraction of the costs of investments. We extend the model to a setting with two competing assemblers and knowledge spillover at the suppliers. We find that the level of inefficiency under decentralized control decreases with increased competition and spillover rate.
引用
收藏
页码:552 / 567
页数:16
相关论文
共 44 条
[1]  
Andersson B., 2006, GMS GLOBAL SUPPLY FO
[2]  
[Anonymous], THEORY PRACTICE REVE
[3]  
BAILY M, 2006, INCREASING GLOBAL CO
[4]  
Baron D., 1984, INF ECON POLICY, V1, P267
[5]   Dynamic inventory and pricing models for competing retailers [J].
Bernstein, F ;
Federgruen, A .
NAVAL RESEARCH LOGISTICS, 2004, 51 (02) :258-274
[6]   New empirical generalizations on the determinants of price elasticity [J].
Bijmolt, THA ;
Van Heerde, HJ ;
Pieters, RGM .
JOURNAL OF MARKETING RESEARCH, 2005, 42 (02) :141-156
[7]  
BROWN T, 2006, FORDS NEW PURCHASING
[8]   Competition in multiechelon assembly supply chains [J].
Carr, SM ;
Karmarkar, US .
MANAGEMENT SCIENCE, 2005, 51 (01) :45-59
[9]  
CHAPPEL L, 2002, AUTOMOTIVE NEWS, V77, P4
[10]  
Chozick A., 2007, WALL STREET J 0720