Personnel tracking on construction sites using video cameras

被引:137
作者
Teizer, J. [1 ]
Vela, P. A. [2 ]
机构
[1] Georgia Tech, Sch Civil & Environm Engn, Atlanta, GA 30332 USA
[2] Georgia Tech, Sch Elect & Comp Engn, Atlanta, GA 30332 USA
基金
美国国家科学基金会;
关键词
ACTIVE CONTOURS; OBJECT TRACKING; MODEL; RETRIEVAL; SUPPORT; IMAGES;
D O I
10.1016/j.aei.2009.06.011
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper discusses the possibility of- and need for-tracking workforce on construction jobsites using video cameras. An evaluation of algorithms and their associated results is presented. The principal objective of this paper is to test and demonstrate the feasibility of tracking workers from statically placed and dynamically moving cameras. This paper also reviews existing techniques to monitor workforce and describes areas where this work might be useful in engineering applications. The main difficulties associated with tracking on a construction site is the significant amount of visual clutter, the changing photometric visual content throughout the course of a day, and the presence of occluding and moving obstacles. The tracking of workers within the field of view of the camera will involve four tracking techniques, density mean-shift, Bayesian segmentation, active contours, and graph-cuts. Typical construction site video will be processed using the proposed algorithms and analyzed to determine the most appropriate tracking method for the video presented. Published by Elsevier Ltd.
引用
收藏
页码:452 / 462
页数:11
相关论文
共 80 条
[1]   Formalization and automation of time-space conflict analysis [J].
Akinci, B ;
Fischen, M ;
Levitt, R ;
Carlson, R .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2002, 16 (02) :124-134
[2]  
ALI S, 2007, P IEEE C VIS PATT RE, P17
[3]  
[Anonymous], 2003, DEV VISION ND ENABLE
[4]   Spatial histograms for region-based tracking [J].
Birchfield, Stanley T. ;
Rangarajan, Sriram .
ETRI JOURNAL, 2007, 29 (05) :697-699
[5]  
BISSACCO A, 2007, DETECTING HUMANS THE
[6]  
BOHN J, 2009, J CONSTRUCT IN PRESS
[7]   Automated retrieval of 3D CAD model objects in construction range images [J].
Bosche, F. ;
Haas, C. T. .
AUTOMATION IN CONSTRUCTION, 2008, 17 (04) :499-512
[8]  
Boykov Y, 2003, NINTH IEEE INTERNATIONAL CONFERENCE ON COMPUTER VISION, VOLS I AND II, PROCEEDINGS, P26
[9]   Construction site image retrieval based on material cluster recognition [J].
Brilakis, Ioannis K. ;
Soibelman, Lucio ;
Shinagawa, Yoshihisa .
ADVANCED ENGINEERING INFORMATICS, 2006, 20 (04) :443-452
[10]  
CALDAS C, 2004, FIELD TRIALS GPS TEC