Constraint programming for project-driven manufacturing

被引:28
作者
Banaszak, Z. A. [1 ]
Zaremba, M. B. [2 ]
Muszynski, W. [3 ]
机构
[1] Tech Univ Koszalin, Dept Comp Sci & Management, Kosice, Slovakia
[2] Univ Quebec UQO, Dept Informat & Ingn, Gatineau, PQ J8Y 3G5, Canada
[3] Wroclaw Univ Technol, Inst Engn Cybernet, PL-50370 Wroclaw, Poland
基金
加拿大自然科学与工程研究理事会;
关键词
Decision support system; Constraint satisfaction problems; Production modeling; Scheduling; JOB-SHOP; ALGORITHM; MODELS;
D O I
10.1016/j.ijpe.2008.12.016
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Project-driven manufacturing. based on the make-to-order or the build-to-order principle and predominant in small and medium-size enterprises (SMEs), calls for an efficient solution of large combinatorial problems, especially in such areas as task scheduling or resource management. This paper addresses the problem of finding a computationally effective approach to scheduling a new project subject to constraints imposed by a multi-project environment. A constraint programming (CP) modeling framework is discussed in the context of an efficient decomposition of the constraint satisfaction problem (CSP) and the evaluation of strategies for pruning the search tree. The proposed approach is illustrated through examples of its application to the evaluation of a new production order. (C) 2009 Elsevier B.V. All rights reserved.
引用
收藏
页码:463 / 475
页数:13
相关论文
共 42 条
[1]  
ABBAS A, 2001, P CONSTR PROGR ART I, P1
[2]  
Alba E, 2005, WILEY SER PARA DIST, P1, DOI 10.1002/0471739383
[3]   Managing multi-project environments through constant work-in-process [J].
Anavi-Isakow, S. ;
Golany, B. .
International Journal of Project Management, 2003, 21 (01) :9-18
[4]  
Archer N. P., 1999, International Journal of Project Management, V17, P207, DOI 10.1016/S0263-7863(98)00032-5
[5]  
Archibald R.D., 2003, MANAGING HIGH TECHNO, V3rd
[6]  
ASKIN RG, 1987, INT J PROD RES, V25, P101, DOI 10.1080/00207548708919825
[7]  
BANASZAK ZA, 2003, PROJECT DRIVEN MANUF
[8]  
Banaszak ZA, 2006, INT SER OPER RES MAN, V92, P409, DOI 10.1007/978-0-387-33768-5_16
[9]   Project-driven planning and scheduling support for virtual manufacturing [J].
Banaszak, Zbigniew A. ;
Zaremba, Marek B. .
JOURNAL OF INTELLIGENT MANUFACTURING, 2006, 17 (06) :641-651
[10]  
Baptiste P., 2001, Constraint-Based Scheduling: Applying Constraint Programming to Scheduling Problems