共 23 条
[1]
Butcher W. S., 1967, Journal of the Construction Division Proceedings of the American Society of Civil Engineers, V93, P59
[2]
Construction resource scheduling with genetic algorithms
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1996, 122 (02)
:125-132
[3]
A time-cost trade-off model with resource consideration using genetic algorithm
[J].
CIVIL ENGINEERING SYSTEMS,
1997, 14 (04)
:291-311
[4]
Davis EW, 1973, AIIE Transactions, V5, P297
[5]
Davis L, 1985, P 9 INT JOINT C ARTI, V1, P162
[6]
RESOURCE LEVELING IN CONSTRUCTION BY OPTIMIZATION
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1989, 115 (02)
:302-316
[8]
FONDAHL JW, 1961, 9 STANF U DEP CIV EN
[9]
GEN M, 1997, GENETIC ALGORITHMS E
[10]
Goldberg D., 1989, GENETIC ALGORITHMS S