Hierarchical decision making in production and repair/replacement planning with imperfect repairs under uncertainties

被引:28
作者
Nodem, F. I. Dehayem [1 ]
Kenne, J. P. [1 ]
Gharbi, A. [2 ]
机构
[1] Ecole Technol Super, Dept Mech Engn, Prod Technol Integrat Lab, Montreal, PQ H3C 1K3, Canada
[2] Ecole Technol Super, Automated Prod Engn Dept, Prod Syst Design & Control Lab, Montreal, PQ H3C 1K3, Canada
关键词
Manufacturing systems; Numerical methods; Optimal control; Production planning; Imperfect repairs; Damage failures; Replacement; PREVENTIVE MAINTENANCE; MANUFACTURING SYSTEMS; MINIMAL REPAIR; GENERAL REPAIR; FUZZY-LOGIC; POLICY; ALGORITHM; MODEL; UNIT;
D O I
10.1016/j.ejor.2008.09.001
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, we analyse an optimal production, repair and replacement problem for a manufacturing system subject to random machine breakdowns. The system produces parts, and upon machine breakdown, either an imperfect repair is undertaken or the machine is replaced with a new identical one. The decision variables of the system are the production rate and the repair/replacement policy. The objective of the control problem is to find decision variables that minimize total incurred costs over an infinite planning horizon. Firstly, a hierarchical decision making approach, based on a semi-Markov decision model (SMDM), is used to determine the optimal repair and replacement policy. Secondly, the production rate is determined, given the obtained repair and replacement policy. Optimality conditions are given and numerical methods are used to solve them and to determine the control policy. We show that the number of parts to hold in inventory in order to hedge against breakdowns must be readjusted to a higher level as the number of breakdowns increases or as the machine ages. We go from the traditional policy with only one high threshold level to a policy with several threshold levels, which depend on the number of breakdowns. Numerical examples and sensitivity analyses are presented to illustrate the usefulness of the proposed approach. (C) 2008 Elsevier B.V. All rights reserved.
引用
收藏
页码:173 / 189
页数:17
相关论文
共 28 条
[1]  
Ansell J. I., 2004, IMA Journal of Management Mathematics, V15, P151, DOI 10.1093/imaman/15.2.151
[2]   Hedging point policy improvement [J].
Boukas, EK .
JOURNAL OF OPTIMIZATION THEORY AND APPLICATIONS, 1998, 97 (01) :47-70
[3]   MANUFACTURING FLOW-CONTROL AND PREVENTIVE MAINTENANCE - A STOCHASTIC-CONTROL APPROACH [J].
BOUKAS, EK ;
HAURIE, A .
IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 1990, 35 (09) :1024-1031
[4]   Production/maintenance cooperative scheduling using multi-agents and fuzzy logic [J].
Coudert, T ;
Grabot, B ;
Archimède, B .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (18) :4611-4632
[5]   ANALYTICAL EVALUATION OF HIERARCHICAL PLANNING SYSTEMS [J].
DEMPSTER, MAH ;
FISHER, ML ;
JANSEN, L ;
LAGEWEG, BJ ;
LENSTRA, JK ;
KAN, AHGR .
OPERATIONS RESEARCH, 1981, 29 (04) :707-716
[6]   Maintenance scheduling and production control of multiple-machine manufacturing systems [J].
Gharbi, A ;
Kenné, JP .
COMPUTERS & INDUSTRIAL ENGINEERING, 2005, 48 (04) :693-707
[7]   Production and preventive maintenance rates control for a manufacturing system: An experimental design approach [J].
Gharbi, A ;
Kenne, JP .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2000, 65 (03) :275-287
[8]  
Kenne J. P., 2003, Journal of Quality in Maintenance Engineering, V9, P66, DOI 10.1108/13552510310466927
[9]   Age-dependent production planning and maintenance strategies in unreliable manufacturing systems with lost sale [J].
Kenne, J. -P. ;
Gharbi, A. ;
Beit, M. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 178 (02) :408-420
[10]   SOME RESULTS FOR REPAIRABLE SYSTEMS WITH GENERAL REPAIR [J].
KIJIMA, M .
JOURNAL OF APPLIED PROBABILITY, 1989, 26 (01) :89-102