A theoretic and practical framework for scheduling in a stochastic environment

被引:60
作者
Bidot, Julien [1 ]
Vidal, Thierry [2 ]
Laborie, Philippe [3 ]
Beck, J. Christopher [4 ]
机构
[1] Univ Ulm, Ulm, Germany
[2] IRISA INRIA, Rennes, France
[3] ILOG SA, Gentilly, France
[4] Univ Toronto, Toronto, ON, Canada
关键词
Scheduling; Planning; Uncertainty; Robustness; Combinatorial optimization; Constraint programming; Simulation; Flexibility; Stability; INACCURATE DATA; SHOP; RULES;
D O I
10.1007/s10951-008-0080-x
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
There are many systems and techniques that address stochastic planning and scheduling problems, based on distinct and sometimes opposite approaches, especially in terms of how generation and execution of the plan, or the schedule, are combined, and if and when knowledge about the uncertainties is taken into account. In many real-life problems, it appears that many of these approaches are needed and should be combined, which to our knowledge has never been done. In this paper, we propose a typology that distinguishes between proactive, progressive, and revision approaches. Then, focusing on scheduling and schedule execution, a theoretic model integrating those three approaches is defined. This model serves as a general template to implement a system that will fit specific application needs: we introduce and discuss our experimental prototypes which validate our model in part, and suggest how this framework could be extended to more general planning systems.
引用
收藏
页码:315 / 344
页数:30
相关论文
共 49 条
[1]   THE SHIFTING BOTTLENECK PROCEDURE FOR JOB SHOP SCHEDULING [J].
ADAMS, J ;
BALAS, E ;
ZAWACK, D .
MANAGEMENT SCIENCE, 1988, 34 (03) :391-401
[2]   A new dominance rule for the total weighted tardiness problem [J].
Akturk, MS ;
Yildirim, MB .
PRODUCTION PLANNING & CONTROL, 1999, 10 (02) :138-149
[3]  
[Anonymous], 1984, EXPT INVESTIGATION H
[4]  
[Anonymous], 1980, Principles of artificial intelligence
[5]  
[Anonymous], 1994, Intelligent Scheduling
[6]  
[Anonymous], INTELLIGENT SCHEDULI
[7]  
[Anonymous], P 15 WORKSH UK PLANN
[8]  
Applegate D., 1991, ORSA Journal on Computing, V3, P149, DOI 10.1287/ijoc.3.2.149
[9]   Proactive algorithms for job shop scheduling with probabilistic durations [J].
Beck, J. Christopher ;
Wilson, Nic .
JOURNAL OF ARTIFICIAL INTELLIGENCE RESEARCH, 2007, 28 :183-232
[10]   Constraint-directed techniques for scheduling alternative activities [J].
Beck, JC ;
Fox, MS .
ARTIFICIAL INTELLIGENCE, 2000, 121 (1-2) :211-250